Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Demolition, site work, renovation and addition to a mixed-use development in Gretna, Florida. Completed plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; for site work for a clubhouse / community center; fitness / recreation center; fitness / recreation center; fitness / recreation center; and fitness / recreation center.

Gretna Community Center Renovation and Expansion The completion date for this project will be 270 days from the date of the Notice to Proceed presented to the successful bidder. Liquidated damages for failure to complete the project on the specified date will be set at $1,500.00 per day. The Bid will be awarded the lowest responsive bidder. A. Painting and finishing of interior and exterior items and surfaces, unless otherwise indicated. B. Includes field painting of bare and covered pipes and ducts (including color coding), and hangers, exposed steel and iron work, and primed metal surfaces of equipment installed under mechanical and electrical work. C. Paint exposed surfaces, except as otherwise indicated, whether or not colors are designated. If not designated, colors will be selected by Architect from designer colors available for the coatings required. A. Furnish all labor, materials, equipment and incidentals required to prepare lawn bed and install sodding, seeding and mulching as shown on contract drawings and as specified. B. Areas to receive sodded grass shall be: Centipede A. This section covers the storm water management practices that the Contractor shall employ in accordance with the NPDES permit governing storm water discharges during construction and in accordance with erosion control practices specified in other sections. B. The Owner has petitioned the DEP for the storm water discharges during construction at this site to be covered by the NPDES General Permit for Construction Activity. A Notice of Intent (NOI) to be covered under this permit has been filed by the Owner. The Contractor is required to file a separate NOI at least forty-eight (48) hours prior to any earth disturbing activities. C. The Contractor shall manage the discharge of storm water from the site in accordance with the NPDES permit and this document. The Contractor shall be responsible for conducting the storm water management practices in accordance with the permit. The Contractor shall be responsible for any enforcement action taken or imposed by Federal or State agencies, including the cost of fines, construction delays, and remedial actions resulting from the Contractor's failure to comply with the permit provisions. D. The Contractor shall monitor the suitability of the designated management practices to achieve the storm water quality provisions of the permit, and shall notify the Owner of the need to change management practices. If changes are ordered by the Owner, an adjustment in Contractor's fee shall be considered in accordance with the General Conditions. However, the Contractor's failure to monitor or report deficiencies to the Owner will result in the Contractor being liable for fines and construction delays resulting from any Federal or State agency enforcement action.

Bid Results

Clubhouse / Community Centers

$1,872,000.00

Public - City

Addition, Demolition, Renovation, Site Work

60

34

2

7

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
38
Bidding Soon
684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 18, 2025

Project location map

14615 Main St, Gretna, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.