BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work and paving for a road / highway in Macclenny, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 24, 2025, an engineer has been selected, and the project is in the early design stage. Bidding is scheduled for April 2028, with construction expected to begin in June 2028 and conclude by November 2029. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 02 Selection Method : Letter of Response and Interview Project Description : SR 121 from I-10 to Georgia State Line Plain Language Description : Design Services for State Road 121 from Interstate 10 (State Road 8) to Georgia State Line - Resurfacing; State Road 20 (US 27) from East of Main Bay Canal Road to Lafayette County Line. Project Manager : Wayne Tooker Jr. Number of contracts that may be awarded from this advertisement : 2 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 121 from I-10 to Georgia State Line

Design

Roads / Highways

$10,200,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
58
Bidding Soon
1,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

FL-121, Macclenny, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.