BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a mixed-use development in Brookfield, Connecticut. Completed plans call for site work for a educational facility.

**As of September 10, 2025, the project was awarded to Verogy, with an awarded amount of $707,703.15** The Town of Brookfield (the Town) is seeking proposals for the development of solar arrays at Brookfield High School (BHS), Whisconier Middle School (WMS) and Candlewood Lake Elementary School (CLES) under the Non-Residential Renewable Energy Solutions (NRES) program. WMS and CLES will be roof-mounted, and BHS will be a parking canopy system. Bid Bond: Not Required This work is subject to the State of CT. CHRO set aside program and contract provisions. This work may be subject to the State of CT Commission on Human Rights and Opportunities (CHRO) set aside program and contract provisions. If applicable, bidders must complete, sign and return the: "CHRO Contract Compliance Regulations Notification to Bidders" form to the grantee at the time of bid opening. A copy of the form is available in a separate PDF document post with this RFP. If applicable, the Contractor shall submit a Set-Aside Plan for approval by the CHRO within 30 days following contract execution. The Town shall retain 2% per month of the total contract value until the Contractor has submitted an approved Set-Aside Plan to CHRO and CHRO has granted approval. Question Deadline 07/11/2025 Questions shall be directed to the Purchasing Manager Tel: 203-775-7323 Email: purchasing@brookfieldct.gov The proposed term duration should be noted in the proposal. It is expected the PPA and maintenance term will be no less than 20 years. Respondents are required to submit a Power Purchase Agreement (PPA) and turnkey sale option for all projects. Please include all-inclusive maintenance pricing on a cost/watt basis and full plan description with proposals. The selected contractor shall prepare and file the necessary applications, as needed with Eversource and comply with any requirements mandated by the State of Connecticut and/or Eversource. Experience with managing solar projects through CT DAS OSCG&R is required under a turnkey sale option.

Award

Educational

$707,703.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
820
Active Projects
305
Bidding Soon
6,832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 18, 2025

Project location map

Multiple Locations, Brookfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.