Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in Dandridge, Tennessee. Completed plans call for site work for a water / sewer project.
**As of July 21 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Bids for the construction of the following Project: 2024 ARPSWIG Wastewater System Improvements Bids Question Deadline 06/23/2025 Contact information and submittal procedures for such questions are as follows: Contact Norma George-Ferrara (norma.george-ferrara@mcgillassociates.com) and copy Jamie Carden, PE (Jamie.carden@mcgillassociates.com) it isfurther recommended that the Bidder call 865.540.0801 to confirm receipt of question(s) submitted. The Project includes the following Work: The upsizing of approximately 2,100 LF of 10" PVC to 12" HDPE by pipe bursting and open-cut methods, including, but not limited to one road bore, manhole rehabilitation, new manholes, manhole abandonment, sewer line abandonment, tree removal, and asphalt cut and replace. The Project has an expected duration of: 120 days for Substantial Completion / 150 days for Final Completion A pre-bid conference for the Project will NOT be held. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders (EJCDC C-200) that are included in the Bidding Documents. Pursuant to Executive Order 11246 (Executive Order 11246, As Amended | U.S. Department of Labor), the OWNER will affirmatively ensure that in any contract entered pursuant to this advertisement will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award, Erwin Utilities is an Equal Opportunity Employer. Any contract that uses federal funds to pay for construction work is a "federally assisted construction contract" and must include the equal opportunity clause found in 2 C.F.R. Part 200, unless otherwise stated in 41 C.F.R. Part 60. Small and minority owned firms and women's business enterprises are encouraged to participate.The Copeland "Anti-Kickback" Act is also applicable, which prohibits workers on construction contracts from giving up wages owed. Contractors must not appear on Sam.GOV disbarment list.The Bid deposit shall be retained by the OWNER if the successful Bidder fails to execute the Contract or fails to provide the required Bonds, as stated above, within ten (10) days after award of the Contract. The successful Bidder shall be required to furnish separate one hundred percent (100%) Performance and Payment Bonds. The Performance Bond shall be in full force and effect for one (1) year after the date of final acceptance of the project by the OWNER.No bidder may withdraw his bid within (60) days after the actual date of the opening thereof.The OWNER reserves the right to reject any and all Bids, to waive informalities, or to reject non-conforming, non-responsive, or conditional bids. The OWNER reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and time.
Bid Results
Water / Sewer
$1,070,300.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
July 30, 2025
Multiple Locations, Dandridge, TN
Related To This Project
Dandridge, TN
Bid Date: Jun 26 2025
Dandridge, TN
Bid Date: Jul 15 2025
Dandridge, TN
Bid Date: Jul 10 2025
Dandridge, TN
Bid Date: Aug 14 2025
Dandridge, TN
Bid Date: Aug 14 2025
Dandridge, TN
Bid Date: Sep 18 2025
Dandridge, TN
Bid Date: Oct 28 2025
Dandridge, TN
Bid Date: Feb 05 2026
Dandridge, TN
Bid Date: Jun 27 2025
Dandridge, TN
Bid Date: May 30 2025
Dandridge, TN
Bid Date: May 14 2025
Dandridge, TN
Bid Date: May 08 2025
Dandridge, TN
Bid Date: May 08 2025
Dandridge, TN
Bid Date: Apr 10 2025
Dandridge, TN
Bid Date: Apr 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
