Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Renovation of an office development in Boise, Idaho. Completed plans call for the renovation of a office development.
ADM Chinden Campus Building & Replace Roof A description of the Work of this project can be summarized to include: Remove existing mechanically attached metal roofing system, 3/4 " EPS insulation board, original (3) ply - B.U.R. and fiberglass insulation down to the structural steel roof deck. Install new single-ply roofing system consisting of 80 mil TPO Roofing Membrane fully adhered (1) layer of 2.6" polyisocyanurate over mechanically attached self-adhering vapor barrier over (1) layer of 2.6" polyisocyanurate. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. AMOUNT AND FORM OF SECURITY: To be considered, bids must be accompanied by an This acceptable bid security in an amount not less than five percent (5%) of the total amount of the bid, including additive alternates. The security may be in the form of a bond or a certified or cashier's check. A standard surety bid bond form meeting all the conditions of AIA Document A310 is acceptable and, if used, must include a certified and current copy of the power of attorney if the bond is executed by the attorney-in-fact on behalf of the surety. PERFORMANCE AND PAYMENT BONDS: A performance bond and payment bond are required for this Project, each in an amount of not less than one hundred percent (100%) of the Contract Price. The performance and payment bonds shall be AIA Document A312, 1984 or the most recent Edition, or a standard surety form certified approved to be the same as the AIA A312 form and shall be executed by a surety or sureties reasonably acceptable to the Owner and authorized to do business in the State of Idaho. Bonds must be provided within ten (10) calendar days following receipt of a Notice of Intent to Award. REJECTION OF BIDS, WAIVER OF INFORMALITIES OR CANCELLATION: Prior to the effective date of a contract, the Administrator of the Division of Public Works shall have the right to accept or reject all bids, to waive any minor deviations/informalities or to cancel the bid. Question Deadline 06/27/2025 Questions concerning a bid must be directed in writing to the designated Design Professional (architect or engineer)
Bid Results
Office
$1,702,900.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
September 8, 2025
270 S 27th St, Boise, ID
Related To This Project
Boise, ID
Bid Date: Jul 17 2025
Boise, ID
Bid Date: Jul 16 2025
Boise, ID
Bid Date: Jul 09 2025
Boise, ID
Bid Date: Jul 09 2025
Boise, ID
Bid Date: Jun 23 2025
Boise, ID
Bid Date: Jul 09 2025
Boise, ID
--
Boise, ID
--
Boise, ID
Bid Date: Jul 31 2019
Boise, ID
Bid Date: Jul 01 2025
Boise, ID
Bid Date: Jul 14 2025
Boise, ID
Bid Date: Dec 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
