Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated July 23, 2025
Site work and new construction of an educational facility in Fresno, California. Conceptual plans call for the construction of a educational facility; and for site work for a educational facility.
License Requirements Valid California Architect License and Leed Accreditation Bid Valid 60 days The University is soliciting Statements of Qualifications for a Programming, Design and Construction Administration of Fresno State Meat Lab Project from California State licensed architectural firms with specific experience in designing higher education facilities. Prequalification with Capital Planning, Design and Construction division of The California State University is required. Construct a new facility, Meats Lab (#229), located at the northeastern portion of the campus to accommodate refrigerated storage and ready-to-eat, with meat processing and packaging spaces which will meet current USDA Certification Standards. The facility will be approximately 5,720 ASF/6,880 GSF. The new facility will create unique spaces for the food safety and security of processed meats products by ensuring that the processed and unprocessed meats are in separate spaces to meet USDA Certification Standards. The project will contain a training/area that will continue to support community engagement, safe socialization practices, and provide a conducive learning space for students. As a starting point the University has developed the following list of tasks for the new Meat Lab Building Facility (#229): o Collaborate with the University to develop the overall aspirational goals of the project, including occupants, functionality, design goals and site improvements. o Floor Plan Develop: including function, area, adjacency requirements, and equipment. o Attend meetings as necessary. o The architect must hire a third-party consultant who has experience designing Meat Lab buildings for the CSU system or equivalent. The third-party consultant will provide input on the new Meat Lab building functionality and layout of equipment. Credentials must be submitted with the RFQ package. o Prepare and document the preferred development option that reflects the needs of the program determined. o Prepare representative graphics of the preferred concept for the use in conveying project intent. o Sustainability Analysis: Utilizing conceptual energy and water analysis in addition to the University campus wide LEED certification efforts. o Conceptual Cost Estimate and Constructability and Phasing Analysis. o Clarify Plan Review Check comments. Other Details Service Provider Scope of Services: A. Feasibility Study 1. Statement of the project's goals, activities to be accommodated, and special requirements or considerations that will guide the study. 2. Summary of key requirements of governing codes and regulations, including major program requirements and constraints, and analysis of project delivery options and strategies. B. Program 1. Development and documentation of detailed requirements for the project, covering design objectives, limitations, and criteria; gross area and space requirements; spatial relationships; needs for flexibility or expandability; special equipment and systems; site requirements; and project budget requirements. 2. Development of component diagrams and flow diagrams (adjacencies) used to determine requirements; functional relationships; and access, circulation and flow patterns within the structure and on the site. 3. Translate information from bubble drawings, matrices, component diagrams, adjacency diagrams, and circulation flows into a statement of the architectural problem and the requirements to be met in formulating the solution. C. Establish Goals and Objectives a. Purpose: Work with the Project Committee to solicit and suggest broad goal statements to guide programming processes. b. Goals: Organize University goals and how current and proposed projects fit into the Campus Master Plan. c. Form and Image Goals: Aesthetic and psychological impact of design, relationship to surroundings, image similar to or distinct from neighbors, context implications. d. Function Goals: Major functions in building and number of people to accommodate. e. Economic Goals: Total project budget, attitude toward initial costs versus long-range operating and maintenance costs, level of quality desired, attitude toward conservation of resources and sustainability. f. Time Goals: Milestone dates through Project occupancy, and anticipated changes. D. Gather Relevant Information a. Purpose: Based upon goals, determine and research relevant information. b. Information includes: Facility users, activities, and schedules; equipment necessary for c. activities to function properly and size of equipment; aspects of project to project into future, future growth and flexibility; space criteria for functions; policy standards for minimum area for various functions; energy usage and requirements; code information affecting programming decisions; site analysis; site boundaries; adjacent buildings and functions; traffic - pedestrian, bicycle, service vehicles, automobiles; utility availability; topography; views; built features; climate; vegetation and wildlife; existing facilities; square footage take-off of areas for various functions from existing floor plans; comparison to future spaces; and net-to-gross area ratios.
Conceptual
Educational
$545,000.00
Public - State/Provincial
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2026
5241 N Maple Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Jun 26 2025
Fresno, CA
Bid Date: Jul 09 2025
Fresno, CA
Bid Date: Jul 08 2025
Fresno, CA
Bid Date: Aug 01 2025
Fresno, CA
Bid Date: Sep 03 2025
Fresno, CA
Bid Date: Aug 28 2025
Fresno, CA
Bid Date: Jul 23 2025
Fresno, CA
Bid Date: Jul 15 2025
Fresno, CA
Bid Date: Jul 08 2025
Fresno, CA
Bid Date: Aug 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
