BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of an educational facility in Montreal, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20077706 Deadline for receipt of complaints 2025-06-27 Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 3 The Universite du Quebec a Montreal, hereinafter referred to as the Owner, having its head office at 1430, rue Saint-Denis, H2X 3J8, Montreal, Quebec, is seeking tenders to convert part of the lobby of the UQAM sports centre into a sports clinic and physical activity research centre. The central element of the redevelopment is the installation of a piece of physical activity equipment called 1080 Quantum and an associated screen. The space will also include two desks with computers for in-depth movement analysis. The architectural work includes, but is not limited to: demolition of existing partitions and suspended ceilings, construction of new walls (slab to slab), new glass partitions, a new glass door, a new floor finish, painting of the walls, painting of the ceiling slab and installation of integrated furniture. The electromechanical work included, but was not limited to, the following: changes to ventilation ducts, changes to sprinklers, new lighting and other electrical work. The Contract also includes the recovery and reinstallation of certain existing equipment. The Contractor shall consider that users and occupants of the building will continue their activities during the work. The Contractor shall act in such a way as to minimise inconvenience to users and staff. Similarly, the external courtyard, parking area, access, etc., will also continue to be used throughout the duration of the work. The Contractor shall ensure that users have access to the premises and facilities in a safe, healthy and uninterrupted environment. This includes all fitting-out work, all demolition, protection, patching and other work required to complete the Work and all related work such as: site preparation and cleaning, temporary protection work, repairs and modifications to existing interior fitting-out work. All jointing, repair and drilling work required for the work hereunder is included. The Contractor shall be entirely responsible for controlling access to the site. In situations where the Contractor has to carry out work elsewhere in the building or where he has to shut down electromechanical services, he will do so outside the normal hours of occupation by users, in accordance with the Owner's authorisations.

Bid Results

Educational

$206,036.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
5
Bidding Soon
1,892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

To Be Determined, Montreal, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.