BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a water / sewer project in La Crosse, Wisconsin. Completed plans call for site work for a water / sewer project.

No bid shall be awarded unless accompanied by Certificate of Organization and Authority, Disclosure of Ownership, together with a list of Subcontractors; and no bid shall be received without certified check for not less than 5%, nor more than 10% of the total amount bid or a bid bond for not less than 5% nor more than 10% of the total amount bid. The BPW decision regarding qualification is final. Bids will be accepted only from such qualified bidders. The time for commencement of the work shall be no later than ten (10) days after issuance of a Notice To Proceed and shall be substantially completed by August 18, 2025. The above public work will be let to the lowest responsible bidder and shall be performed in accordance with the plans and specifications for the same now on file with the Engineering Department for the inspection of bidders and in accordance with the prepared form of contract and bond also on file with said Engineering Department .Fees and request for Plans and Specifications shall be submitted to the Engineering Department, 400 La Crosse Street, La Crosse, Wisconsin, 54601; Phone: (608) 789-7505 and FAX Number: (608) 789-8184. Scope:- 10th & State St. Storm Sewer Extension - The work, in general, includes the laying 180 feet of 15" storm sewer in a portion of existing State Street. The work also includes the necessary demolition of existing improvements to allow for the new work, erosion control, paving removal, finish grading, storm sewer manholes, asphalt paving, sidewalk paving, curb replacement, installing an alley apron, and site restoration. PROJECT LOCATION: 900 BLOCK STATE STREET LA CROSSE, WISCONSIN The work in this contract generally consists of new storm sewer construction in the east half of the 900 block of State Street, with a new tie-in to existing storm sewer in the intersection of 10 th & State. Connection to new storm sewer in the new midblock alley, on the south side of the 900 block of State Street is required as well. All additional work, such as concrete curb & gutter, sidewalks, curb ramps, alley aprons, pavement, grading, and various appurtenances are as detailed in the project manual. Specifications for this work shall be based upon the WisDOT 2025 Highway and Structure Standard Details and drawings, with any discrepancies superseded by the City of La Crosse 2025 Standard Specifications & Procedures and Details, and with any additional discrepancies superseded by those specifications and details herein this project's materials, including these special specifications, the Project Manual, and any attached appendices, plans sheets, or details.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

10

7

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

900 State St, La Crosse, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.