Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
Site work and paving for a road / highway in Normal, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of August 06, 2025, the project was awarded to Rowe Construction, with an awarded amount of $3,356,897.49.** This project consists of furnishing all work necessary for the completion of milling and hot mix asphalt overlay, along with necessary incidentals, on various streets in the Town of Normal, Illinois. The proposed improvement consists of the following approximate quantities: 14,945 SY Hot-Mix Asphalt Surface Removal, 2 1/4; 7,484 SY Hot-Mix Asphalt Surface Removal, 3; 1,785 SY PCC Surface Removal, Variable Depth, 0 to 1 1/2; 11,335 SY PCC Surface Removal, Variable Depth, 1 to 2 3/4; 1,406 SY PCC Surface Removal, 1 1/4 to 2 3/4; 114 SY PCC Surface Removal, Variable Depth, 1 1/2 to 3; 12,000 SY Area Reflective Crack Control; 2,112 feet Full Depth Saw Cut for Crack and Seat; 4,256 SY Crack and Seat Existing PCC Pavement; 661 SY PCC Pavement Removal, Special; 404 SY HMA Pavement Removal, Special; 135 tons Aggregate Base Course, Type B; 18,000 pounds Bituminous Materials (Prime Coat); 18,500 pounds Bituminous Materials (Tack Coat); 15,000 feet Longitudinal Joint Sealant; 628 tons Polymerized HMA Binder Course, IL-4.75, N50; 651 tons HMA Binder Course, IL-9.5FG, N50; 1,417 tons Polymerized HMA Binder Course, IL-9.5FG, N90; 1,906 tons HMA Surface Course, Mix C, N50; 1,480 tons Polymerized HMA Surface Course, SMA, 9.5, Mix E, N80; 325 SY Driveway Pavement Removal; 440 SY PCC Driveway Pavement; 1,300 SF Sidewalk Removal; 2,500 SF PCC Sidewalk, 6; 275 SF Concrete Median; 2,300 feet Combination Curb & Gutter Removal; 2,300 feet Combination Concrete Curb & Gutter, Type B-6.18, Special; 3,300 feet Combination Concrete Curb and Gutter Removal and Replacement, Special; adjustment, removal, removal & replacement, rehabilitation, or relocation of 90 water and sewer structures; 22,500 feet Short-term Pavement Markings Paint; 5,800 feet Short-term Pavement Markings Tape; 11,500 feet Paint Pavement Marking Line 6; 250 feet Paint Pavement Marking Line 12; 250 feet Paint Pavement Marking Line 24; 1,200 SF Paint Pavement Marking Letters & Symbols; and all other necessary items and incidentals required to complete this project according to the plans and specifications. The Town reserves the right to reject any or all bids received. The bid award will be made by the Town Council, and the decision of the Council will be final.
Award
Roads / Highways
$3,356,897.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
July 28, 2025
Multiple Locations, Normal, IL
Related To This Project
Normal, IL
Bid Date: Jun 30 2025
Normal, IL
Bid Date: Jul 10 2025
Normal, IL
Bid Date: Jul 03 2025
Normal, IL
Bid Date: Jul 10 2025
Normal, IL
Bid Date: Jul 15 2025
Normal, IL
Bid Date: Aug 22 2025
Normal, IL
Bid Date: Aug 19 2025
Normal, IL
--
Normal, IL
Bid Date: Jun 17 2025
Normal, IL
Bid Date: Jun 04 2025
Normal, IL
Bid Date: May 27 2025
Normal, IL
Bid Date: Jun 20 2025
Normal, IL
Bid Date: Aug 27 2020
Normal, IL
Bid Date: Mar 25 2021
Normal, IL
Bid Date: May 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
