Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
Renovation of a transportation facility in DFW Airport, Texas. Completed plans call for the renovation of a transportation facility.
As of August 6, 2025 this project was awarded to Robinson Taylor Industries LLC in the amount of $47,293.20 This Contract, if awarded, isto provide routine periodic maintenance of air ventilation systemsin DFW Airport's Indoor Gun Range. Personnel will be required to conduct periodic replacement of specific HVAC filters designed to collect lead dust generated during training activities and yearly calibration of the magnahelic gauges on the HVAC system. There are building automation sensors on the building that will alarm at a preset threshold to give the team advanced notice of filter loading. Personnel performing this task shall be competent in the areas of indoor air quality, environmental cleaning, health and safety standards, and management/clean-up of hazardous materials. Improper maintenance of ventilation systems may result in inadequate air filtration inside the indoor range which may lead to poor indoor air quality or increased levels of lead particulate. Other significant consequences of improper handling of air filters during replacement is the unpermitted release of lead dust to exterior environments and overexposure of lead particulates to maintenance personnel. The scope of services shall be to provide on-call services for the proper removal of select filters and replacement with new air filters provided by the contractor. General Description: Provide routine periodic maintenance of air ventilation systems in DFW Airport's Indoor Gun Range. Contract Term: Five (5)-year period. Minority/Women-Owned Business Enterprise Goal: Goal for this contract is 0%. Applicable Laws: This solicitation is being conducted in accordance with Texas Local Government Code Title 8, Subtitle A, Chapter 252. Question Deadline 07/07/2025 at 5:00 PM CT Intent to Bid Due Date: Jul 21st 2025, 2:00 PM CDT
Award
Transportation Terminals
$200,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
August 20, 2025
2400 Aviation Dr, DFW Airport, TX
Related To This Project
DFW Airport, TX
Bid Date: Jun 25 2025
DFW Airport, TX
Bid Date: Aug 13 2025
DFW Airport, TX
Bid Date: Jul 11 2025
DFW Airport, TX
Bid Date: Jul 14 2025
DFW Airport, TX
Bid Date: Jul 25 2025
DFW Airport, TX
Bid Date: Jul 26 2025
DFW Airport, TX
Bid Date: Jun 13 2025
DFW Airport, TX
Bid Date: Jul 03 2025
DFW Airport, TX
Bid Date: Jul 08 2025
DFW Airport, TX
Bid Date: Jun 30 2025
DFW Airport, TX
Bid Date: Jun 13 2025
DFW Airport, TX
Bid Date: Jun 13 2025
DFW Airport, TX
Bid Date: May 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
