Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Renovation of a transportation facility in DFW Airport, Texas. Completed plans call for the renovation of a transportation facility.
Minority/Women Business Enterprise (M/WBE) GOAL: 12% Construction Services. Total Contract Duration 180 calendar days (Substantial Completion of 120 days with an additional 60 consecutive calendar days for Final Completion). To enhance the opportunity for a successful RFB submission, the Airport highly encourages a representative from your company that will complete bidding documents including MWBE forms and submittals for the bid, proposal or statement of qualifications to attend all pre-bid, pre-proposal or pre-qualification statement meetings. Cone of Silence - To ensure a proper and fair evaluation, the DFW International Airport has established a cone of silence applicable to all Competitive Selection Processes, including RFQs, RFPs and RFBs. The cone of silence is designed to protect the integrity of the procurement process by shielding it from undue influences. The cone of silence will be imposed on all Competitive Selection Processes beginning with advertisement for the same and ending with the Board's selection for RFQs, RFPs or the Board's award for a RFB. The Cone of Silence begins when the solicitation is advertised/released and ends after the contract/purchase order is awarded, noting that release of some information is restricted by law. Potential bidders/proposers shall not discuss any aspect of a released solicitation with Airport personnel with exception to the contract administrator/ buyer listed in the solicitation. Questions Due Date: Jul 11th 2025, 4:00 PM CDT Rerouting of Sewer Smells Two lift stations currently exhaust sewer odors into the Level 0 area. These odors are then picked up by the existing exhaust system and discharged near the main terminal entrance, negatively affecting customer experience. This project will implement the following approach to eliminate the odors at the source and prevent them from reaching public areas: Source Filtration and Air Treatment o Install new fans and filtration racks at each lift station. o This phase focuses on removing odors directly at the source. Exhaust Rerouting o Redirect the existing exhaust away from the main entrance to discharge at the sides of the terminal. o Involves installing new ductwork and booster fans to relocate the exhaust air path. o Involves modification of existing fire protection system to ensure code compliance. BAS Integration and Control o Tie new booster fans into the existing Terminal D Building Automation System (BAS). o Integrate the existing exhaust fans into the Terminal D BAS to ensure centralized control and monitoring. Intent to Bid Due Date: Aug 13th 2025, 2:00 PM CDT
Post-Bid
Transportation Terminals
$2,009,423.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
October 14, 2025
2400 Aviation Dr, DFW Airport, TX
Related To This Project
DFW Airport, TX
Bid Date: Jul 11 2025
DFW Airport, TX
Bid Date: Jul 14 2025
DFW Airport, TX
Bid Date: Jul 25 2025
DFW Airport, TX
Bid Date: Jul 26 2025
DFW Airport, TX
Bid Date: Aug 28 2025
DFW Airport, TX
Bid Date: Sep 03 2025
DFW Airport, TX
Bid Date: Sep 15 2025
DFW Airport, TX
Bid Date: Jun 25 2025
DFW Airport, TX
Bid Date: Jul 21 2025
DFW Airport, TX
Bid Date: Jun 13 2025
DFW Airport, TX
Bid Date: Jul 03 2025
DFW Airport, TX
Bid Date: Jul 08 2025
DFW Airport, TX
Bid Date: Jun 30 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.