Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated June 19, 2025
Site work and paving for a mixed-use development in Overland, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Pavement resurfacing, ADA Improvements and potential replacement of signal at Route 180. Length: 1.37 miles DBE Goal (if applicable) : 10% Traffic Safety, Operations and Engineering (SO&E) Study; Conceptual Study Report using Blueprint for Arterials including planning report and conceptual cost estimates for potential alternatives A Traffic Safety, Operations and Engineering (SO&E) Study will include traffic modeling for conceptual plan alternatives. The method of Contractor Selection has not been Determined at this time. MODOT - RFQ Engineering - Pavement Resurfacing ADA Improvements and Potential Replacement of Signal
Conceptual
Roads / Highways
$879,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2026
Woodson Rd, Overland, MO
Related To This Project
Overland, MO
Bid Date: Aug 06 2025
Overland, MO
Bid Date: Aug 27 2025
Overland, MO
Bid Date: Sep 24 2025
Overland, MO
--
Overland, MO
Bid Date: Jul 09 2025
Overland, MO
Bid Date: Apr 10 2025
Overland, MO
Bid Date: Apr 30 2025
Overland, MO
Bid Date: Apr 30 2025
Overland, MO
Bid Date: Mar 19 2025
Overland, MO
Bid Date: Apr 02 2025
Overland, MO
Bid Date: Feb 05 2025
Overland, MO
Bid Date: Aug 15 2025
Overland, MO
--
Overland, MO
Bid Date: Aug 28 2024
Overland, MO
Bid Date: Sep 13 2019
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
