BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a mixed-use development in Mendota Heights, Minnesota. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of July 23rd, 2025, bids were rejected and will rebid, project will be rebid next year .** The streets proposed for rehabilitation are Abbey Way, Canton Court, Haverton Circle, Haverton Road, Morson Circle, and Winthrop Court. Proposed street rehabilitation improvements include bituminous pavement reclamation, storm sewer improvements, water main maintenance, aggregate base, concrete curb and gutter repair, catch basin repair, bituminous surfacing, pedestrian ramp improvements, restoration, and appurtenant work. UTILITIES Total of six (6) storm sewer manhole installations. Total of fifteen (15) water main utility excavations for maintenance operations. STREET REHABILITATION Approximately 12,400 SY of bituminous pavement reclamation. Approximately 3,100 TON of bituminous pavement. Approximately 2,750 LF of B618 concrete curb and gutter, Approximately 850 SY of sod. Bids shall be for the furnishing of all labor, materials and equipment to perform all the work in connection with the above stated project. All Bids must be accompanied by a Cash Deposit, Certified Check or Bid Bond, made payable to the City of Mendota Heights, Minnesota in an amount equal to five percent (5%) of the total amount of Bid, conditioned that if the Bidder is the successful Bidder, he will enter into an Agreement with the City in accordance with said bid and will furnish such Performance and Payment Bids as are specified. If the Bidder fails to enter into an Agreement, this deposit will be forfeited as liquidated damages to the Owner. The Owner reserves the right to reject any or all Bids and to waive any informalities in Bidding. No bids may be withdrawn for a period of sixty (60) days from the date of opening of the Bids.

Final Planning

Roads / Highways

$1,125,704.00

Public - City

Paving, Site Work

3

29

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
145
Bidding Soon
1,558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

January 23, 2026

Project location map

Kensington East Street, Mendota Heights, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.