Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Site work and paving for a mixed-use development in Mendota Heights, Minnesota. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of July 23rd, 2025, bids were rejected and will rebid, project will be rebid next year .** The streets proposed for rehabilitation are Abbey Way, Canton Court, Haverton Circle, Haverton Road, Morson Circle, and Winthrop Court. Proposed street rehabilitation improvements include bituminous pavement reclamation, storm sewer improvements, water main maintenance, aggregate base, concrete curb and gutter repair, catch basin repair, bituminous surfacing, pedestrian ramp improvements, restoration, and appurtenant work. UTILITIES Total of six (6) storm sewer manhole installations. Total of fifteen (15) water main utility excavations for maintenance operations. STREET REHABILITATION Approximately 12,400 SY of bituminous pavement reclamation. Approximately 3,100 TON of bituminous pavement. Approximately 2,750 LF of B618 concrete curb and gutter, Approximately 850 SY of sod. Bids shall be for the furnishing of all labor, materials and equipment to perform all the work in connection with the above stated project. All Bids must be accompanied by a Cash Deposit, Certified Check or Bid Bond, made payable to the City of Mendota Heights, Minnesota in an amount equal to five percent (5%) of the total amount of Bid, conditioned that if the Bidder is the successful Bidder, he will enter into an Agreement with the City in accordance with said bid and will furnish such Performance and Payment Bids as are specified. If the Bidder fails to enter into an Agreement, this deposit will be forfeited as liquidated damages to the Owner. The Owner reserves the right to reject any or all Bids and to waive any informalities in Bidding. No bids may be withdrawn for a period of sixty (60) days from the date of opening of the Bids.
Final Planning
Roads / Highways
$1,125,704.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
January 23, 2026
Kensington East Street, Mendota Heights, MN
Related To This Project
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Aug 21 2025
Mendota Heights, MN
Bid Date: Aug 26 2025
Mendota Heights, MN
Bid Date: Oct 30 2025
Mendota Heights, MN
Bid Date: Dec 10 2025
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Mar 13 2025
Mendota Heights, MN
Bid Date: Mar 05 2025
Mendota Heights, MN
Bid Date: Feb 26 2025
Mendota Heights, MN
Bid Date: Jan 05 2022
Mendota Heights, MN
--
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Jul 17 2024
Mendota Heights, MN
Bid Date: Jul 18 2024
Mendota Heights, MN
Bid Date: May 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
