Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Site work and paving for a mixed-use development in Mendota Heights, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Bids for the construction of the Friendly Hills Neighborhood Improvements (S.A.P. 140-106-007 & Project No. MH202407). The streets proposed for rehabilitation are Creek Ave, Fox Pl, Aztec Ln, Hokah Ave, Apache St, Cheyenne Ln, Decorah Ln, Pontiac Pl, Ocala Ln, Ocala Ct, Nashua Ln, Navajo Ln, Keokuk Ln, Pagel Rd, Hazel Ct, Havenview Ct, Pueblo Dr, Mohican Ln, Pueblo Ln, Apache Ln, and Apache Ct. Proposed project improvements include bituminous pavement reclamation, storm sewer improvements, water main improvements, sanitary sewer improvements, aggregate base, concrete curb and gutter repair, catch basin repair, bituminous surfacing, pedestrian ramp improvements, restoration, and appurtenant work. UTILITIES Total of 8 sanitary sewer manhole installations. Total of 1400 LF of sanitary sewer pipe installations. Total of 75 water main utility excavations for maintenance operations. Total of 2800 LF of water main pipe installation (open trench). Total of 5250 LF of watermain pipe installation (pipe bursting). Total of 1250 LF of copper pipe installation. Total of 15 hydrant installations. Total of 51 gate valve installations. Total of 105 water service connections. Total of 236 sacrificial anode bags. Total of 37 storm sewer manhole / catch basin installations. Total of 2000 LF linear feet of storm sewer pipe installations. Total of 2500 LF of perforated PE pipe. STREET REHABILITATION Approximately 79,600 SY of bituminous pavement reclamation. Approximately 5,500 SY of bituminous pavement removal. Approximately 28,500 SF of trail reconstruction. Approximately 3,000 CY of aggregate base. Approximately 22,400 TONS of bituminous pavement. Approximately 18,500 LF of B618 concrete curb and gutter. Approximately 1000 SY of concrete driveway pavement. Approximately 2000 SF of concrete walk. Approximately 1,800 CY of boulevard topsoil borrow. Approximately 10,500 SY of sod. Est. Completion Date: Oct. 31, 2026 The bid bonds must be payable to the City of Mendota Heights in the amount of five percent (5%) of the amount of the vbid, to be forfeited as liquidate damages in the event that the vbid is accepted and the bidder fails to promptly enter into a written contract and furnish the required bonds. Bids will only be accepted from Contractors who purchase digital or paper Bidding Documents as specified above. All bids shall be accompanied by a Non-Collusion Affidavit, Responsible Contractor form, Form 21126D, and bid bond as described previously. The City reserves the right to reject any or all bids, to waive irregularities, and to award the contract in the best interests of the Owner. The City may retain the deposits of the three lowest bidders for a period of at least sixty (60) days after the date set for the opening of bids.
Award
Roads / Highways
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
April 4, 2025
Pueblo Ln, Mendota Heights, MN
Related To This Project
Mendota Heights, MN
Bid Date: Mar 13 2025
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Jul 09 2025
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Aug 21 2025
Mendota Heights, MN
Bid Date: Aug 26 2025
Mendota Heights, MN
Bid Date: Oct 30 2025
Mendota Heights, MN
Bid Date: Dec 10 2025
Mendota Heights, MN
Bid Date: Feb 26 2025
Mendota Heights, MN
Bid Date: Jan 05 2022
Mendota Heights, MN
--
Mendota Heights, MN
--
Mendota Heights, MN
Bid Date: Jul 17 2024
Mendota Heights, MN
Bid Date: Jul 18 2024
Mendota Heights, MN
Bid Date: May 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
