Published June 23, 2025 at 8:00 PM
Updated July 8, 2025
Site work for a water / sewer project in Trout Lake, Washington. Completed plans call for site work for a water / sewer project.
GAOA Trout Lake Water System Replacement - Provide and install approximately 2,800 lineal feet of new 6" and 2" waterline and related valves and fittings and connection to existing service connections and new water meters. This project has been designed to have the ability to be accomplished in phases, due to potential funding limitations. The plan set has clear explanation regarding the three phases; refer to the plan set. The three phases are summarized below: a. Phase 1 (Base Item 1): Installation of new water line at entrance to site from main water line running along frontage of Ranger Station site, new master meter, and the installation of water main and hydrants to phasing limits shown in the plan set. Note, the intersection between Phase 1 and Phase 2 are located near building 1019 and 2800. b. Phase 2 (Option Item 1): Installation of the remainder of new water main not installed in Phase 1 and associated fire hydrants. See plan set for phasing limits. Note, the intersection between Phase 1 and Phase 2 are located near building 1019 and 2800. c. Phase 3 (Option Item 2): Installation of new service lines on site, and abandonment of old water mains and services. This phase will also include the overhead fire truck fill station. 2. Provide and install a new truck fill water station; 3. Provide and install new yard hydrants; and 4. Other related items to complete the above work. The project site is located at the Mt. Adams Ranger District Compound (Klickitat County, WA). The compound address is as follows: 2455 Highway 141 Trout Lake, WA 98650 Estimated start work: August 4, 2025 ; complete the entire work ready for use not later than November 30, 2025. The Government's estimate for Base Item is between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2025
August 4, 2025
2455 WA-141, Trout Lake, WA
Related To This Project
Trout Lake, WA
Bid Date: Sep 03 2025
Trout Lake, WA
Bid Date: Nov 13 2024
Trout Lake, WA
Bid Date: Jun 03 2024
Trout Lake, WA
Bid Date: Apr 30 2024
Trout Lake, WA
Bid Date: May 14 2024
Trout Lake, WA
Bid Date: Aug 03 2023
Trout Lake, WA
Bid Date: Aug 11 2023
Trout Lake, WA
Bid Date: Aug 04 2023
Trout Lake, WA
--
Trout Lake, WA
Bid Date: Jun 30 2023
Tacoma, WA
Bid Date: Jul 01 2025
Everett, WA
Bid Date: Jul 02 2025
Everett, WA
Bid Date: Jul 02 2025
Wenatchee, WA
Bid Date: Jun 27 2025
Tacoma, WA
Bid Date: Jul 01 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.