Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2025 at 8:00 PM
Updated July 9, 2025
Site work and new construction of a fire / police facility in Ririe, Idaho. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
This project is to build a new fire station apparatus storage building in Ririe, Idaho. The facility will be located on property currently owned by the Central Fire District. This property is located at 249 West Ririe Highway, Ririe, ID. See Exhibit A for concept design documents. The work associated with the new building is anticipated to include the following Demolition of existing concrete foundations and elements remaining from the prior building New 60' x 80' pre-engineered metal building engineered to satisfy Risk Category IV requirements within the International Building Code as required for fire station facilities. The building is anticipated to be a single slope roof configuration with the low end of the building anticipated at 24' height. Three (3) vehicle bays - each 20' wide The fourth 20' wide bay is anticipated for business and residential functions either as part of this project or as part of a future phase depending on funding levels allocated for the project. The business and residential uses are anticipated to be in a 2-story stacked configuration. Fire suppression system throughout the building Mechanical systems to maintain tempered conditions for the vehicle bays (unit heater systems anticipated) Business and residential function areas will be serviced with a residential type system with a single or multiple furnaces as needed for the spaces. Repair of conditions with asphalt and concrete surrounding the new building in the area disturbed during construction RFQ CM/GC- Ririe Station 2 - Fire Station Apparatus Building Questions Due: Friday, June 27, 2025 by noon Addendum Issued: No later than Wednesday, July 2, 2025 by 5 PM Detailed instructions may be obtained from jamee@resinar-chitecture.com. The Central Fire District reserves the right to reject any submission.
Post-Bid
Fire / Police
$4,500,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
November 10, 2025
249 W Ririe Hwy, Ririe, ID
Related To This Project
Ririe, ID
Bid Date: Aug 06 2025
Ririe, ID
Bid Date: Nov 17 2025
Ririe, ID
Bid Date: Feb 19 2026
Ririe, ID
--
Ririe, ID
--
Ririe, ID
Bid Date: Feb 26 2026
Ririe, ID
Bid Date: Apr 29 2025
Ririe, ID
Bid Date: Nov 04 2025
Ririe, ID
Bid Date: Apr 22 2025
Ririe, ID
Bid Date: Apr 08 2025
Ririe, ID
Bid Date: Feb 13 2025
Ririe, ID
Bid Date: Dec 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
