Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 12, 2025 at 8:00 PM
Updated August 13, 2025
Site work for a civil project in Crawfordville, Florida. Completed plans call for site work for a water / sewer project.
Alexander Road Lift Station and Force Main Installation All technical inquiries and clarification requests shall be submitted in writing to Berkleigh Nowak, Procurement and Contracts Coordinator, bnowak@mywakulla.com in accordance with the ITB. Verbal clarifications will not be provided. The Wakulla County Board of County Commissioners re-serves the right to waive informalities in any bid; reject any or all proposals, in whole or in part; re-bid a project, in whole or in part; and to accept a proposal that in its judgment is the lowest and best bid of a responsible bidder. In accepting a bid, Wakulla County may award a contract based only on the base bid, the base bid plus all alternates, or the base bid plus any. Question Deadline Jul 15, 2025 at 3:00 PM The proposed project consists of the construction of a new lift station along Alexander Road which will allow for flows to be rerouted from an existing overburdened liftstation (Hickory Park lift station) and provide additional system capacity for additional sewer service and septic conversions. Construct approximately 15,343 linear feet of new 16" force main along Alexander Street and Rehwinkel Rd to connect the proposed Alexander lift station to Phase 1A line along Highway 98. Construct approximately 1,853 linearfeet of 4" new sewer forcemain along Wakulla Arran Road to reroute some flows to Palmetto lift station and approximately 13,331 linear feet along Wakulla Arran Road, Cajer Posey Road and Alexander Road of 12" new sewer force main to connect Palmetto lift station to the proposed Alexander lift station. The new site for the lift station is on a parcel currently owned by Wakulla County approximately 4,200 feet south of the intersection between Martin Luther King Memorial Boulevard and Cajer Posey Road. The lift station is designed to handle peak hour flows of 2,000 gallons per minute. There are also emergency connections for the bypass pump. The construction will include an asphalt driveway as well as the duplex lift station site. The electrical equipment, controls, generator, and pumps installed at the Alexander Lift Station are standardized across all the County's existing lift stations. Therefore, the County will use the same type of aforementioned equipment for a seamless integration within the existing system. The available grant funding for this project is $9,590,115.00.
Award
Water / Sewer
$9,590,115.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
October 6, 2025
Alexander Rd, Crawfordville, FL
Related To This Project
Crawfordville, FL
Bid Date: Aug 08 2025
Crawfordville, FL
--
Crawfordville, FL
--
Crawfordville, FL
Bid Date: Sep 25 2025
Crawfordville, FL
Bid Date: Dec 02 2025
Crawfordville, FL
Bid Date: Dec 16 2025
Crawfordville, FL
--
Crawfordville, FL
Bid Date: Jan 23 2026
Crawfordville, FL
Bid Date: Jun 24 2025
Crawfordville, FL
Bid Date: May 22 2025
Crawfordville, FL
Bid Date: May 28 2025
Crawfordville, FL
Bid Date: May 13 2025
Crawfordville, FL
Bid Date: May 06 2025
Crawfordville, FL
Bid Date: May 06 2025
Crawfordville, FL
Bid Date: Apr 02 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
