Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Renovation of a fire / police facility in Miami, Florida. Completed plans call for the renovation of a fire / police facility.
The types of contracts available under the MCC Program are construction projects, facility repairs, neighborhood improvements, emergency repairs and maintenance work with a maximum value of $5.0M; ORD 09-101. All capital departments are participating. Additional opportunities are available through Weatherization Assistance Program (WAP) which enables low-income families to reduce their energy bills by making their homes more energy efficient. Funds are used to improve the energy performance of dwellings by families in need, using the most advanced technologies and testing procedures available in the housing industry. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. The work in general consists of the following: Interior/Exterior renovations which include all existing bathrooms, renovation of new kitchen in stainless steel (countertops and backsplash to be unpainted stainless) with new appliances, new HVAC system with new duct work, new acoustical ceilings with new lighting package, new exterior windows and storefront replacements, miscellaneous CMU & Brick work and repainting of the fire station both interior and exterior. The proposed new windows and doors are to be Miami-Dade County approved Impact Resistant with current NOAs. The scope is to be inclusive of removing the existing windows and doors with all the ancillary accessories accompanied...i.e. Kantech card reader systems, existing hurricane shutters, door sensors, electric door strikes, all existing doors hardware & Lock systems to be replaced with new (refer to plans and specs for details in door schedule remarks), etc. All (3) exterior Roll-up doors are also to be replaced with Miami-Dade county approved systems having current NOAs, and meeting current wind load calculations, inclusive of new commercial grade motors, door sensors and push-button controllers. The contractor is to refer to plans and specifications provided with the RPQ and Bid documents. SBE- Service: 1.0% NIGP Codes: (NIGP 98852) Landscaping services LICENSE REQUIREMENT Question Deadline 07/03/2025 at 5:00 PM ET Any questions submitted after aforementioned date shall not be considered. MDFR will review and answer the questions, prior to the bid due date. If you have any questions, contact Roland Bujeiro at (305) 458-6822 ROLAND.BUJEIRO@miamidade.gov. MDFR Construction Contracts Planning Section Manager at benedit@miamidade.gov
Post-Bid
Fire / Police
$2,730,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
August 11, 2025
4200 SW 142nd Ave, Miami, FL
Related To This Project
Miami, FL
Bid Date: Aug 05 2025
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Jul 15 2025
Miami, FL
Bid Date: Aug 14 2025
Miami, FL
Bid Date: Jul 22 2025
Miami, FL
Bid Date: Jul 29 2025
Miami, FL
Bid Date: Aug 12 2025
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Oct 30 2019
Miami, FL
Bid Date: Jan 28 2021
Miami, FL
--
Miami, FL
Bid Date: Apr 07 2021
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
