BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a mixed-use development in Chatham, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work consists of cold milling the existing asphalt surface and paving a variable depth HMA Surface Course, IL 9.5, Mix C, N50 (Fiber Modified), along with removal and replacement of sidewalk curb ramps and traffic control, officially known as the VILLAGE OF CHATHAM, BRISTOL AND HASTINGS ROAD- HMA MILLAND OVERLAY, Chatham, Illinois. The project shall consist of saw cutting, cold milling and disposal of existing HMA surface course, placement of temporary ramps, overlay of existing pavement with variable depth HMA Surface Course (Fiber Modified), removal and replacement of ADA sidewalk ramps and adjacent curb, and all traffic control along Bristol and Hastings Road adjacent to the work. The length of the project is 1034 LF and the nominal pavement width is 27 LF. All work shall be in accordance with the contract documents and details and shall be performed in accordance with the Illinois Department of Transportation Standard Specifications for the work and materials specified. Construction Layout and site QA/QC shall be performed by the Contractor. All labor and materials are included as part of this Request for Proposals and shall be subject to the Illinois Department of Labor Prevailing Wages for such work. As a condition of this contract, all work shall be performed by a Prime contractor prequalified by the State of Illinois to do work for the Illinois Department of Transportation, including sub-contractors. All work must be completed by August 29, 2025 allowing for a two-week period (if necessary) for the village to conduct additional patching operations after milling operations have been completed. Method of Payment: This work shall paid at the agreed contract unit prices. Final payment will be made based upon completion and acceptance of the improvements. Questions concerning this proposal may be submitted to Dustin Patterson via email or phone: dpatterson@chathamil.gov or 217-697-5805 . Rejection of Bids: The Owner reserves the right to waive technicalities or to reject any or all proposals. Award will not be made solely upon the prices bid, but rather the final selection by the Village of Chatham Board

Award

Roads / Highways

$128,397.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
85
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

Multiple Locations, Chatham, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.