Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 25, 2025
Site work for a water / sewer project in Anniston, Alabama. Completed plans call for site work for a water / sewer project.
Said Cost Represents the Cost of Printing, Reproduction, Handling, and Distribution, Therefore No Refund Will Be Granted. Checks for Bidding Documents Shall Be Payable to “gmc.” Partial Sets of Bidding Documents Will Not Be Available From the Issuing Office. Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda if Any, Obtained From Sources Other Than the Issuing Office. Bid Security Shall Be Furnished in Accordance With the Instructions to Bidders. This Project is Being Funded by Srf Project No. Fs010297-01 and Will Require Dbe Documentation From the Low, Responsive, Responsible Bidder No Later Than 10 Days After Bid Opening. This Project is Being Supported, in Whole or in Part, by Federal Award Number Slfrp2635 Awarded to the State of Alabama by the U.s. Department of the Treasury. All Participants Must Comply With All Federal The Project Includes the Following Work: Installation of Approximately 30,000 Lf of 6" Cl350 Di Water Main, Fire Hydrants, Tank and Booster Pump Station Controls, and Related Appurtenances in Calhoun County, Al. Requirements Applicable to the Loan (Including Those Imposed by the 2014 Appropriations Act and Related Srf Policy Guidelines) Which the Participant Understands Includes, Among Other, Requirements That All of the Iron and Steel Products Used in the Project Are to Be Produced in the United States (“american Iron and Steel Requirement”). The Owner Reserves the Right to Waive Any Informalities, or to Reject Any or All Bids, and to Award the Contract to the Best and Most Responsible Bidder. All Bidders Shall Submit, Upon Request, a List of Projects "Successfully Completed" in the Last 2 Years, Having the Same Scope of Work and Approximate Construction Cost as Specified in This Project. All Bidders Must Comply With Requirements of the Contractor's Licensing Law of the State of Alabama and Be Certified for the Type of Work on Which the Proposal is Submitted. Each Bidder Must Deposit With His Bid, Security in the Amount, Form and Subject to the Conditions Provided in the Instructions to Bidders. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975, and Must Show Evidence of License Before Bidding or Bid Will Not Be Received or Considered by the Engineer; the Bidder Shall Show Such Evidence by Clearly Displaying the License Number on the Outside of the Envelope in Which the Proposal is Delivered. No Bidder May Withdraw His Bid Within 60 Days After the Opening Thereof. "Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc."
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
Multiple Locations, Anniston, AL
Related To This Project
Anniston, AL
Bid Date: Jul 23 2025
Anniston, AL
--
Anniston, AL
--
Anniston, AL
Bid Date: Aug 12 2025
Anniston, AL
Bid Date: Aug 07 2025
Anniston, AL
Bid Date: Aug 19 2025
Anniston, AL
Bid Date: Aug 20 2025
Anniston, AL
Bid Date: Aug 12 2025
Anniston, AL
Bid Date: Jun 19 2025
Anniston, AL
Bid Date: Jun 16 2025
Anniston, AL
Bid Date: Jun 25 2025
Anniston, AL
Bid Date: Jun 12 2025
Anniston, AL
Bid Date: Jun 05 2025
Anniston, AL
Bid Date: Jun 17 2025
Anniston, AL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
