Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2025 at 8:00 PM
Updated September 9, 2025
Site work for a civil project in Lawton, Oklahoma. Completed plans call for site work for a water / sewer project.
Description: Description of Work: Pipe burst approximately 8,900 LF of 8-inch and 10-inch sanitary sewer lines in various locations in the City of Lawton, including cleaning and bypass pumping, as well as fittings, services, and appurtenances as shown in the contract documents. Contractor is responsible for all material, labor, and equipment necessary to complete the work. All other information relating to this project is contained within the attached Contract Documents. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Deposits will be returned to successful bidder upon execution of the contract documents. Estimated cost range of project: From 3,100,000 to $3,800,000 Time for project completion: 250 Calendar Days Wage Rates: Yes Bids shall also be made in accordance and with the prevailing hourly rate of wages for this locality and project as determined by the Commission of Labor and filed with the Secretary of State in accordance with the provisions of 40 O.S. 1971, 197.1-17, which prevailing hourly rate of wages is made a part of this notice by reference as though fully set forth herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Funding Project # QRF-24-0061-CW Bid Instructions: Bids timely filed with the City Clerk shall be publicly opened and read aloud at the time and location specified as bids above. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening ofbids, as well as received after the time set for opening ofbids, will not be considered and will be returned unopened. Within one hundred twenty (120) days from the bid opening date, the successful bidder shall execute a written contract embodying all provisions ofthe bidding documents. Question Deadline 07/15/2025 Each written request for such interpretation should be addressed to Engineer. To be given consideration, each such request must be received at least seven (7) days prior to the date fixed for the opening of bids. No interpretation ofthe means ofthe specifications, or other pre-bid documents will be made to any bidder orally. Goals for MBE CONSTRUCTION 13.94%; SUPPLIES - 7.48%; SERVICES -14.29%; EQUIPMENT - 9.13% Goals for WBE CONSTRUCTION - 6.92%; SUPPLIES - 0; SERVICES - 26.51%; EQUIPMENT -19.90%
Award
Water / Sewer
$3,778,632.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
September 22, 2025
Multiple Locations, Lawton, OK
Related To This Project
Lawton, OK
Bid Date: Jul 03 2025
Lawton, OK
Bid Date: Jul 17 2025
Lawton, OK
Bid Date: Jun 25 2025
Lawton, OK
--
Lawton, OK
Bid Date: Jul 02 2025
Lawton, OK
--
Lawton, OK
Bid Date: Aug 18 2025
Lawton, OK
Bid Date: Sep 23 2025
Lawton, OK
Bid Date: Jul 03 2025
Lawton, OK
--
Lawton, OK
Bid Date: Jun 25 2025
Lawton, OK
Bid Date: Jun 17 2025
Lawton, OK
Bid Date: May 22 2025
Lawton, OK
Bid Date: Aug 03 2025
Lawton, OK
Bid Date: May 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
