BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a water / sewer project in Ryegate, Montana. Working plans call for site work for a water / sewer project.

The project consists of updating the Town's disinfection system with the addition of an 8' X 4' Chlorine Storage Room equipped with a hypochlorite chlorination system. All laborers and mechanics employed by Contractor or Subcontractors in performance of the construction work shall be paid wages at rates as required by Montana Prevailing Wage Rates for Heavy Construction. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to Town of Ryegate, in an amount not less than ten percent (10%) of the total amount of the bid. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful Bidder(s) and a certificate(s) of that insurance shall be provided. A. The Contractor shall, except as otherwise specifically stated in applicable parts of these Contract Documents, provide and pay for all labor, materials, equipment, tools, facilities, and services necessary for proper execution, testing, and completion of the work. B. The project will provide the owner with a new chlorine storage room equipped with specified pumps, storage tanks, plumbing, and safety equipment for a sodium hypochlorite system. C. The following are the major components of the work: 1. Construct an 8' X 4' chlorine storage room within existing building including installation of a unit heater, fan, emergency shower and associated electrical and plumbing work. 2. Installation of all sodium hypochlorite pump and tank and chlorination system tiein into existing pumphouse. Bids get rejected.

Final Planning

Water / Sewer

$124,995.00

Public - City

Site Work

3

6

5

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
4
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

January 29, 2026

Project location map

20 MT-300, Ryegate, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.