BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Port Angeles, Washington. Conceptual plans call for site work for a water / sewer project.

Install a new 6" ductile iron water main on Tumwater Truck Route between Lauridsen Blvd and HWY 101 to increase fire flow and allow metered connections to commercial business. An alternative alignment would be to install a larger main on Newell Road. May consider pairing with WT1117 Lauridsen Blvd/Tumwater Fire Flow. As of September 24, 2025, this project is include in the City's 2025-2030 Capital Improvement Program (CIP). It is still in the conceptual stage and currently unfunded. Construction is not anticipated to begin in the next 5 years.

Conceptual

Water / Sewer

$349,700.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
117
Bidding Soon
2,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2031

Project location map

S Tumwater Truck Rte, Port Angeles, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.