BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a power facility in Bolivar, Missouri. Completed plans call for site work for a power facility.

System Size and Performance The proposed solar photovoltaic system must have a nameplate capacity at or near 479 kW or an equivalent system size that is capable of producing approximately 710,000 kilowatt-hours (kWh) annually. Bidders must provide supporting documentation or production modeling to justify the estimated annual output. Additional Requirements Street Cut and Repaving The bid must include all required street cuts and full repaving necessary for electrical routing or system connections. These items must be itemized. Electrical Work: Bid must include electrical conduit and wiring from the solar system to the Recreation Center electrical infrastructure. Prevailing Wage Compliance: The project must comply with the Missouri Department of Labor Prevailing Wage Law. All work must be performed in accordance with prevailing wage rates as established by the state. The awarded contractor is required to complete and submit the PW-8 form to the Missouri Department of Labor as part of project compliance. Equipment Placement Restrictions: No hardware may be placed on the south side of the building. See attached image for acceptable placement zones. The City of Bolivar seeks bids for the design, procurement, installation, and commissioning of a solar photovoltaic (PV) system at or near a capacity of 479 kW. The system should be designed to achieve at or near an estimated annual energy production of 710,000 kWh. The proposal must include all labor, materials, equipment, and services for a complete grid-tied solar installation.

Award

Solar Power Generation

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
22
Bidding Soon
549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

To Be Determined, Bolivar, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.