Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Renovation of a transportation facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a transportation facility.
Bid South Shop Boiler Installation Milwaukee General Mitchell Airport South Shop Boiler Installation Project: requirements of attached "South Shop Boiler SOW" Questions Due Date: Jul 9th 2025, 10:30 AM CDT Online Portal 1. Demolition & Removal a. Disconnect and make safe existing boiler components (where applicable for replacement projects) 2. Boiler Installation & Placement a. Set and secure existing Reillo M#AR800 boiler on existing equipment pad 3. Piping & Valve Installation a. Tie-in to existing 6" flanges b. Add tees and install 4" HWS & HWR butterfly valves with blind flanges for future use. c. Install new 2.5" HWS & HWR piping to new tees d. Connect customer-supplied 2.5" Y-strainer on HWR line and B&G triple duty valve on HWS e. Install new 2.5" butterfly valve on HWR piping f. Install one temperature well on HWS & HWR for future use g. Measure and fabricate new hot water piping to the boiler h. Install all necessary water pipe, fittings, and valves to connect the boiler to existing supply piping i. Install new 6" automatic isolation valve j. Install (2) 8"x8"4" tees with blind flanges for a future indirect water heater tank k. Install a new condensate neutralizer kit l. Install customer provided circulation pump, condensate neutralizer, and 3-way valve 4. Insulation a. Insulate new HWS & HWR piping with fiberglass insulation b. Install new insulation on boiler connections 5. Gas & Venting a. Tie-in to existing gas line b. Install a new 2lb gas regulator c. Reconnect natural gas piping to the boiler d. Install all necessary gas pipe, fittings, and valves to connect the new unit to existing gas supply piping e. Install new venting (e.g., 6" schedule 40 CPVC for exhaust and 6" schedule 40 PVC for combustion air intake) f. Install all necessary flue venting and fittings to properly vent the boiler through the existing flue chase g. Rework existing water heater gas vent to gain clearance for boiler venting h. Install new exhaust and intake venting, including core drilling new holes i. Install a new roof curb and flash the new curb to the existing built-up roof, or penetrate through the existing curb cap and fabricate/install a replacement weather-tight cap 6. Electrical a. Provide all electrical connections with a new disconnect b. Reconnect the boiler to the existing line voltage supply 7. Startup & Testing a. Startup of the new boiler and verification of proper operation b. Owner training c. Testing and balancing 8. General Provisions a. Condensate piping b. Crane and rigging (where applicable) 9. Warranty a. Labor and Materials: Guaranteed free from defects for one year b. Manufacturer's Warranty: As provided by the boiler manufacturer
Award
Transportation Terminals
$68,202.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2025
August 11, 2025
5300 S Howell Ave, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jun 30 2025
Milwaukee, WI
Bid Date: Jul 07 2025
Milwaukee, WI
Bid Date: Nov 28 2025
Milwaukee, WI
Bid Date: Jul 15 2025
Milwaukee, WI
Bid Date: Jul 10 2025
Milwaukee, WI
Bid Date: Jul 15 2025
Milwaukee, WI
Bid Date: Jun 26 2025
Milwaukee, WI
Bid Date: Jul 10 2025
Milwaukee, WI
Bid Date: Jul 11 2025
Milwaukee, WI
Bid Date: Jul 02 2025
Milwaukee, WI
Bid Date: Jul 02 2025
Milwaukee, WI
Bid Date: Jun 19 2025
Milwaukee, WI
Bid Date: Jun 20 2025
Milwaukee, WI
Bid Date: Jun 18 2025
Milwaukee, WI
Bid Date: Jun 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
