BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Renovation of an educational facility in Statenville, Georgia. Completed plans call for the renovation of a educational facility.

**As of August 7th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project consists of the installation of a new roofing system over the original modified bitumen roofing system. All Questions Concerning This Project Should Be Addressed to the Project Manager: King Smith; Ksmith@altmanbarrettarchitects.com Bid security shall be submitted with each bid in the amount of [5] percent of the bid amount. No bids may be withdrawn for a period of [60] days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder Successful bidder shall begin the Work on receipt of the Notice to Proceed (est. August, 2025) and shall complete the Work prior to October 31, 2025. Bidder shall submit with the bid form an estimated material procurement timeline along with an estimated construction timeline Installation of single ply retrofit roof system over existing low slope trapezoidal rib standing seam metal roof panels +/- 9,200 SF high gym roof. Roof system consists of TPO membrane (self-adhering), cover board, 1 1/2 " thick rigid insulation board and EPS flute fill insulation board. Mechanically attach to existing standing seam metal roof panels. B. Low roof lobby and locker rooms (+/- 5,200 SF) Removal of existing retrofit metal roof panel system constructed over original gravel surface bur with zonolite lightweight insulating fill over corrugated metal decking and bar joists. Install single-ply roofing system. Roof system consists of TPO membrane (selfadhering), coverboard and 1 1/2 " rigid insulation board mechanically attached to existing structural corrugated metal decking. Remove existing metal fascia panels and metal soffit panels; replace with new metal fascia and soffit panels. C. Install metal wall panels over existing exposed brick endwalls of high gym. D. Type of Contract: 1. Project will be constructed under a single prime contract.

Award

Educational

$229,890.00

Public - County

Renovation

10

11

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
8
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 1, 2025

Project location map

190 GA-94, Statenville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.