Site work for a water / sewer project in Clinton, Arkansas. Completed plans call for site work for a water / sewer project.
**As of August 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Furnishing all tools, materials, and labor, and performing the necessary work for the installation of approximately 1457 new radio read water meters of various sizes, AMR hardware kit, and software The contractors shall make such inspection and studies of the site of the work as to familiarize themselves with all conditions to be encountered. Each bid must be accompanied by an acceptable form of bid guaranty in the amount equal to at least five percent of the whole bid, and such bid bond or cashier's check shall be subject to the conditions provided in the Instructions to Bidders. Bids must be made upon the official bid sheets contained in the specifications, and such bid sheets SHALL NOT be removed from the remainder of the Specifications and Contract Documents. All bids shall be sealed, and the envelopes addressed to Nick Stithem, Van Buren County Public Water Authority, 1292 AR-95, Clinton, AR 72031. All bids shall be plainly marked on the outside of the envelope, specifying that it is asealed bid for Meter Replacement Project, the time for the opening of bids, and the name and current contractor's license number of the bidder. Bidders are required to have a contractor's license under the terms of Act 150, Arkansas Acts of 1965, as amended. The Owner reserves the right to reject any and all bids and to waive any informalities in the proposal deemed to be in the best interests of the Owner. The Owner further reserves the right to withhold the awarding of the contract for a period not to exceed 60 days after the receipt of bids. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: 1. Furnish and install approximately 1457 meters of various sizes. 2. Furnish AMR Hardware Kit. 3. Furnish and install Software. Question Deadline 07/14/2025
Bid Results
Water / Sewer
$637,077.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
Multiple Locations, Clinton, AR
Related To This Project
Clinton, AR
Bid Date: May 27 2025
Clinton, AR
Bid Date: May 29 2025
Clinton, AR
Bid Date: Oct 09 2025
Clinton, AR
Bid Date: May 29 2025
Clinton, AR
Bid Date: May 29 2025
Clinton, AR
Bid Date: Jun 19 2025
Clinton, AR
Bid Date: May 21 2025
Clinton, AR
Bid Date: Apr 15 2025
Clinton, AR
Bid Date: Feb 18 2025
Clinton, AR
Bid Date: Feb 18 2025
Clinton, AR
Bid Date: Jan 20 2025
Clinton, AR
Bid Date: Jan 20 2025
Clinton, AR
Bid Date: Oct 30 2024
Clinton, AR
Bid Date: Nov 06 2024
Clinton, AR
Bid Date: Oct 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.