Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 17, 2025
Renovation of a stadium in Lexington, Kentucky. Completed plans call for the renovation of a 3,800-square-foot, one-story above grade stadium.
The Lexington Center Corporation is in the process of engaging a General Contractor to provide various pre-construction and construction phase services for the Rupp Arena, First Floor Corridor Renovation project. The project involves the renovation of the first floor corridor and adjacent meeting room. This bid package involves new electrical, lighting, HVAC ductwork revisions, fire protection, new walls and finishes. The successful bidder will be the General Contractor selected by the Lexington Center Corporation. The scope of work items include(s): Division 2 - Selective Demolition Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 - Finish Carpentry / Millwork Division 8 - HM Doors & Frames & Barn Doors Division 8 - Storefront Entrances Division 9 - Framing, GWB, Painting, Acoustical Ceilings Division 21 - Sprinkler Systems Division 23 - HVAC Division 26 - Electrical Completed and executed bids submitted on the Official Bid Form and enclosed in a sealed envelope will be received at necto architecture, 310 Old Vine Street, Suite 100A, Lexington, KY, 40507. Bids delivered by telephone, telegraph, fax machine and email will NOT be accepted. Bids delivered by the United States Postal Service and received on or before the official Bid Date/Time will be accepted. Final award of Contract will be made on the basis of a responsive and responsible bid which, in the sole opinion of Lexington Center Corporation, offers the best value. The Lexington Center Corporation reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the Owner may be served. Question Deadline 07/11/2025 Bidders questions must be emailed to Jay Copley (jay@nectoarchitecture.com) no later than July 11, 2025 and will be answered by email to all registered bidders by email. Following are generalized comments regarding the scope of this bid package. a. This bid includes shop drawing preparation b. This bid includes the modification of the fire protection system as indicated on the construction documents which will affect the building's fire protection system. Contractor must coordinate all work with the owner for the schedule of this work. c. This bid includes electrical work that will require coordination with portions of the building's power to be turned off for duration of work. d. Rupp Arena is an on-going businesses constantly booking concerts, events, exhibitions and the like. There may be times when the work must be postponed or interrupted to avoid disturbance to an event. The bidder must take this into account as he prepares his bid. The Owner will not pay for lost time or additional mobilizations Addendum #1 has been issued as of 7-14-2025.
Post-Bid
Arenas / Stadiums
$1,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
August 15, 2025
430 W Vine St, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Jul 07 2025
Lexington, KY
Bid Date: Aug 12 2025
Lexington, KY
Bid Date: Jul 15 2025
Lexington, KY
Bid Date: Jul 10 2025
Lexington, KY
Bid Date: Jul 14 2025
Lexington, KY
Bid Date: Jul 23 2025
Lexington, KY
Bid Date: Jul 24 2025
Lexington, KY
Bid Date: Jul 10 2025
Lexington, KY
Bid Date: Jul 08 2025
Lexington, KY
Bid Date: Jul 15 2025
Lexington, KY
--
Lexington, KY
Bid Date: Jun 26 2025
Lexington, KY
Bid Date: Jul 10 2025
Lexington, KY
Bid Date: Jun 30 2025
Lexington, KY
Bid Date: Jul 15 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
