BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and new construction of a mixed-use development in Lima, Ohio. Completed plans call for the construction of a 280-square-foot municipal facility; and for site work for a municipal facility.

New restroom facility that is approximately 280 square feet. New exterior concrete masonry walls with face brick veneer and roof structure consisting of wood trusses and an asphalt shingle roof system. New insulated hollow metal door frames with hollow metal doors, complete with door hardware, and glazing. New interior masonry wall construction with tongue and groove pine wood ceiling and drywall ceiling as indicated on the ceiling plan. Flooring to include sheet carpeting. Painting as indicated on drawings. Site Work: Includes the following: Minor demolition work, grading, site utilities (water, sanitary, storm), concrete work, lawn seeding, relocating an existing small tree, site furnishings (bench), and removing/salvaging/re-installing a small portion of the existing aluminum fence If a contractor would like to visit the site other than during the pre bid meeting, they can do so by contacting Cindy Pottkotter, cpottkotter@creategm.com to schedule a visit. A Bid Security in the form of a certified check, cashier s check, irrevocable letter of credit, or surety company bond pursuant to Chapter 1305 of the Ohio Revised code in the amount of 10% of the total bid shall accompany each bid; or a bid guaranty bond in accordance with Chapter 153.571 of the Ohio Revised Code in the amount of 100% of the total bid shall accompany each bid. Successful Bidders shall conform to the Davis-Bacon Act Schedule of Prevailing Wages. The bidder may access the Federal Prevailing Wages at Website under wage determination for the current edition of wage rates The Owner reserves the right to reject any or all bids and to waive informalities, irregularities and/or errors in the bids to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. Est. Value Notes: $224,000.00 Est. Completion Date: Feb. 20, 2026 PROJECT SCOPES OF WORK General Construction: New restroom facility that is approximately 280 square feet. New exterior concrete masonry walls with face brick veneer and roof structure consisting of wood trusses and an asphalt shingle roof system. New insulated hollow metal door frames with hollow metal doors, complete with door hardware, and glazing. New interior masonry wall construction with tongue and groove pine wood ceiling and drywall ceiling as indicated on the ceiling plan. Flooring to include sheet carpeting. Painting as indicated on drawings. Site Work: Includes the following: Minor demolition work, grading, site utilities (water, sanitary, storm), concrete work, lawn seeding, relocating an existing small tree, site furnishings (bench), and removing/salvaging/re-installing a small portion of the existing aluminum fence Plumbing Work: Includes the following: A new 4" sanitary service with 3" vent-thru-roof, a new 1" domestic cold water service with submeter and backflow preventor, a flush-valve water closet, a lavatory, a pointof-use water heater for the lavatory, an exterior frost-proof drinking fountain, a hose bibb, a floor drain, a floor sink, an interior clean out, and an exterior rodding hole. Sanitary, vent, and domestic water piping as required. Refer to plans for additional information. HVAC Work: Includes the following: A new 75 CFM ceiling-mounted bathroom exhaust fan with backdraft damper, (2) wall louvers, motor-operated damper connected to bathroom exhaust fan, (3) air devices for air transfer, and (2) unit heaters. Refer to plans for additional information. Electrical Work: Includes the following: A new 240/120V electrical service, LED exterior and interior lighting, receptacles, power for handicap door operator, and HVAC equipment connections. Refer to plans for additional information

Award

Municipal

$264,320.00

Public - County

New Construction, Site Work

17

26

8

9

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
176
Bidding Soon
2,217
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 15, 2025

Project location map

2500 Ada Rd, Lima, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.