Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 17, 2025
Site work for a bridge / tunnel in Montville, Connecticut. Completed plans call for site work for a bridge / tunnel.
This contract is subject to state contract compliance requirements, including non- discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification as Small Business Enterprises ("SBE") from the Connecticut Department of Administrative Services ("DAS"). A minimum of 6.25% of the state-funded portion must be set aside for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses ("M/W/DisBE"). The contractor must demonstrate good faith effort to meet the 25% set-aside goals. In addition to other reservations and conditions contained in the proposal documents, the Town of Montville reserves the right to waive any technical defects in the proposals received; to waive any formalities or irregularities; to reject any and all proposals for any reason, including that it or they do not conform to the terms and conditions described herein, as determined by the Town in its sole discretion; to accept or reject any part of any proposal received; to present and negotiate terms of a contract together or separately with any party submitting a proposal; to determine qualifications exclusively and finally; to request additional qualifications; and to select any proposal or part thereof based on any combination of factors, including the amount proposal, the time of completion, and the Town's best interests. The Town reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether or not that proposal is selected. Any questions regarding this bid should be emailed to the Engineer, Mr. Kyle Haubert, P.E., at khaubert@claengineers.com, no later than 3:00 PM on Friday, July 11, 2025. And Julie Chapman, Director of Finance shall be cc d at jchapman@montville-ct.org. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder s maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. The Work shall be substantially completed by within 45 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 60 days after the date when the Contract Times commence to run
Post-Bid
Bridges / Tunnels
$700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
August 15, 2025
Beechwood Rd, Montville, CT
Related To This Project
Montville, CT
Bid Date: Aug 06 2025
Montville, CT
Bid Date: Sep 17 2025
Montville, CT
--
Montville, CT
Bid Date: Oct 08 2025
Montville, CT
--
Montville, CT
Bid Date: Oct 24 2025
Montville, CT
Bid Date: Oct 30 2025
Montville, CT
Bid Date: Oct 15 2025
Montville, CT
Bid Date: Jun 26 2025
Montville, CT
Bid Date: Apr 23 2025
Montville, CT
Bid Date: Apr 11 2025
Montville, CT
Bid Date: Apr 04 2025
Montville, CT
--
Montville, CT
Bid Date: Feb 12 2025
Montville, CT
Bid Date: Feb 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
