BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Site work and paving for a road / highway in Carson City, Nevada. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of August 11, 2025, bids were canceled. No definite date for the rebid.** Title | District 2 Fairview Drive Pavement Preservation Project No. | P350525003 PWP No. | CC-2025-430 Engineer's Estimate | $410,000 Funding | This project is locally funded. BABAA | This project is not subject to BABAA requirements. Type | This project is deemed a horizontal construction project. Pre-Bid Meeting | This project will not conduct a pre-bid meeting. DBE | There are no Disadvantaged Business Enterprise (DBE)/Small Business Enterprise (SBE) program goals for this procurement. However, the City, in accordance with Title VI of the Civil Rights Act of 1964 and Title 49 Code of Federal Regulations Part 26, hereby notifies all bidders and proposers that it shall affirmatively ensure that in regard to any contract entered into, certified DBE/SBE firms shall be afforded full opportunity to submit bids and proposals in response to our invitation and shall not be discriminated against on the grounds of race, color, religion, sex, sexual orientation, gender identity or expression, age, disability or national origin in consideration for an award. Although there is no contract-specific goal associated, the City encourages bidders to make the same effort to ensure nondiscrimination in the award and administration of subcontracts, to help remove barriers to the participation of DBEs/SBEs, and to assist in the development of firms that can compete successfully in the marketplace outside the DBE/SBE program. Summary | This project includes, but is not limited to, placing Type 3 Modified rapid setting slurry seal, pavement patching, and restriping of Fairview Drive from Roop Street east to the I-580 SB Terminal Intersection. Scope Carson City is accepting sealed bids for all labor, materials, equipment, and incidentals necessary for the District 2 Fairview Drive Pavement Preservation Project. This project includes but is not limited to placing Type 3 Modified rapid setting slurry seal, and restriping of Fairview Drive from Roop Street east to the I-580 SB Terminal Intersection. Construction of this project shall be completed in Summer/Fall 2025. Sealed bids must be submitted in accordance with the bid documents, drawings and plans, specifications and special conditions related hereto. Question Deadline 07/16/2025 at 5:00 PM PT

Final Planning

Roads / Highways

$624,007.00

Public - City

Paving, Site Work

28

8

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
19
Bidding Soon
384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

February 11, 2026

Project location map

Fairview Dr, Carson City, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.