BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of a mixed-use development in State College, Pennsylvania. Completed plans call for the renovation of a educational facility; and museum.

The former art museum building is 51,013 GSF. This project entails a comprehensive transformation of the space, use, and function to create a general-purpose classroom, class lab, and art storage building. This includes the complete renovation of the facility, a comprehensive building system upgrade, and upgrades to the building enclosure. The Palmer Repurposing project has a total project cost of $40.4 million, which includes a total construction cost of $30.4 million. A specific trade package solicitation is being requested to assist in developing the final GMP.

Post-Bid

Museum

$30,400,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
93
Bidding Soon
998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

September 15, 2025

Project location map

650 Bigler Rd, State College, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.