This is a service / maintenance or supply contract in Elsie, Nebraska. Contact the soliciting agency for additional information.
The State of Nebraska, Department of Natural Resources (hereafter known as NeDNR or State), is issuing this Request for Proposal, RFP NDNR25-01 for the purpose of selecting a qualified contractor to prepar e an Environmental Impact Statement (EIS) for the Perkins County Canal Project (Project). Prior to construction of the proposed project, NeDNR is seeking federal authorization through Section 404 of the Clean Water Act. The U.S. Army Corps of Engineers, Omaha District (USACE), as the lead federal agency, has determined that an EIS is needed to meet their National Environmental Policy Act (NEPA) compliance requirements. The selected contractor will work directly for the USACE and be compensated by NeDNR. This RFP is not a federal procurement action. The Project will include (but may not be limited to) the following general elements: o Preparation of the Draft Environmental Impact Statement o Project Meetings including scoping, cooperating agency, and public meetings o Perform environmental evaluations to supplement existing survey information for project area o Preparation of Final Environmental Impact Statement o Preparation of Draft Record of Decision A contract resulting from this Request for Proposal will be issued for a period effective from date of contract award through December 31, 2028, with the option to renew for two (2) additional six (6) month periods as mutually agreed upon by all parties. The State reserves the right to reject any or all proposals, wholly or in part, or to award to multiple bidders in whole or in part. The State reserves the right to waive any deviations or errors that are not material, do not invalidate the legitimacy of the proposal, and do not improve the bidder's competitive position. All awards will be made in a manner deemed in the best interest of the State. The method of Contractor Selection has not been Determined at this time Question Deadline 07/09/2025 Written questions are due and should be submitted via e-mail to matt.manning@nebraska.gov. Contract award 08/18/2025 Contractor start date 09/01/2025
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
Multiple Locations, Elsie, NE
Related To This Project
Seward, NE
Bid Date: Jun 24 2025
Osceola, NE
Bid Date: Jun 24 2025
Omaha, NE
Bid Date: Jul 15 2025
Omaha, NE
Bid Date: Jul 22 2025
Omaha, NE
Bid Date: Jun 24 2025
Fremont, NE
Bid Date: Jul 01 2025
Lincoln, NE
Bid Date: Jul 11 2025
Oak Creek Township, NE
Bid Date: Jul 01 2025
Omaha, NE
--
Hastings, NE
--
Hastings, NE
--
Hastings, NE
--
Hebron, NE
--
Aurora, NE
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.