BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated June 25, 2025

This is a service / maintenance or supply contract in Elsie, Nebraska. Contact the soliciting agency for additional information.

The State of Nebraska, Department of Natural Resources (hereafter known as NeDNR or State), is issuing this Request for Proposal, RFP NDNR25-01 for the purpose of selecting a qualified contractor to prepar e an Environmental Impact Statement (EIS) for the Perkins County Canal Project (Project). Prior to construction of the proposed project, NeDNR is seeking federal authorization through Section 404 of the Clean Water Act. The U.S. Army Corps of Engineers, Omaha District (USACE), as the lead federal agency, has determined that an EIS is needed to meet their National Environmental Policy Act (NEPA) compliance requirements. The selected contractor will work directly for the USACE and be compensated by NeDNR. This RFP is not a federal procurement action. The Project will include (but may not be limited to) the following general elements: o Preparation of the Draft Environmental Impact Statement o Project Meetings including scoping, cooperating agency, and public meetings o Perform environmental evaluations to supplement existing survey information for project area o Preparation of Final Environmental Impact Statement o Preparation of Draft Record of Decision A contract resulting from this Request for Proposal will be issued for a period effective from date of contract award through December 31, 2028, with the option to renew for two (2) additional six (6) month periods as mutually agreed upon by all parties. The State reserves the right to reject any or all proposals, wholly or in part, or to award to multiple bidders in whole or in part. The State reserves the right to waive any deviations or errors that are not material, do not invalidate the legitimacy of the proposal, and do not improve the bidder's competitive position. All awards will be made in a manner deemed in the best interest of the State. The method of Contractor Selection has not been Determined at this time Question Deadline 07/09/2025 Written questions are due and should be submitted via e-mail to matt.manning@nebraska.gov. Contract award 08/18/2025 Contractor start date 09/01/2025

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
81
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.