Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2025 at 8:00 PM
Updated August 19, 2025
Renovation of an educational facility in Stevens Point, Wisconsin. Completed plans call for the renovation of a educational facility.
In general, the work consists of: upgrading original equipment for the emergency generator systems and normal service entrances for four (4) buildings on the University of Wisconsin - Stevens Point Campus. The scope of upgrades for each building includes the installation of a new exterior natural-gas generator system, a portable generator connection box (PGCB), replacing the existing service entrance equipment with new, and installing new electrical distribution equipment for the new generator system. The execution of scope shall be phased to maintain occupancy of buildings during construction, unless noted otherwise. Temporary provisions shall be supplied by the contractor to facilitate temporary installations, equipment start up, and functional testing as indicated in these documents. The documents include suggested phasing of scope as a basis of intent; contractor shall coordinate final phasing of scope with the A/E during the submittal process. Question Deadline 07/14/2025 Bidders shall bring any inadequacies, omissions, or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences Custom Bid Results Mechanical Contractor Invalid bid Electrical Contractor Total Electric Service, Inc. - $1,570,890.00
Award
Educational
$1,570,890.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
October 1, 2025
2100 Main St, Stevens Point, WI
Related To This Project
Stevens Point, WI
Bid Date: Sep 03 2025
Stevens Point, WI
Bid Date: Aug 05 2025
Stevens Point, WI
Bid Date: Aug 05 2025
Stevens Point, WI
Bid Date: Aug 05 2025
Stevens Point, WI
Bid Date: Sep 16 2025
Stevens Point, WI
Bid Date: Aug 27 2025
Stevens Point, WI
Bid Date: Sep 18 2025
Stevens Point, WI
Bid Date: Sep 16 2025
Stevens Point, WI
Bid Date: Jul 08 2025
Stevens Point, WI
Bid Date: Jun 19 2025
Stevens Point, WI
Bid Date: May 30 2025
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
