BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Demolition, site work, paving and new construction of a civil project in Wilhoit, Arizona. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

0000 YV YYV YYV-0-(212)T Yavapay County (Wash Bridge at Walnut Grove Rd) The proposed work is located in Yavapai County on Walnut Grove Road / Wagoner Road at the Wash Bridge, 7.8 miles east from SR 89, southeast of the Town of Wilhoit. The work consists of bridge replacement. The work includes construction of a new cast-in-place concrete box culvert under the existing bridge and removal of the existing bridge superstructure. The work also includes new roadway pavement over the culvert, reconstruction of approach roadway and applying pavement markings and other related work. NorthWest District Item # LOCAL Engineering Specialist: Yusuf Kadem Pre-qualification: Yes Question Deadline 09/02/2025 Questions shall be submitted through the Questions and Answers (Q&A) link located within the corresponding letting date and project proposal number links. The Department may not answer all questions, and any decision on whether a question is answered will be within the sole discretion of the Department. Any questions received less than three working days prior to the bid opening date may not be answered. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 4.80. The time allowed for the completion of the work included in this contract will be 180 working days. AZDOT - Bridge Replacement - Walnut Grove Road / Wagoner Road

Bid Results

Bridges / Tunnels

$1,032,973.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

43

5

7

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
45
Bidding Soon
736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

October 6, 2025

Project location map

S Wagoner Rd, Wilhoit, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.