Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Renovation of a data center facility in Fairlawn, Ohio. Completed plans call for the renovation of a data center facility.

Options: A. 2025 POLICE DEPARTMENT HVAC SYSTEM UPGRADE B. 2025 DATACENTER PROJECT C. COMBINED 2025 POLICE DEPARTMENT HVAC SYSTEM UPGRADES AND DATACENTER PROJECT Each bidder is required to file with its Proposal a certified check or cashier's check for an amount equal to five percent (5%) of its bid, but in no event more than fifty thousand dollars, or a bid bond for ten percent (10%) of its bid payable to the "City of Fairlawn." Copies of the Check or Bid Bond shall be included with the bid solicitation. The Contractor shall submit the original check or bid bond to guarantee its bid to the City of Fairlawn by 10:00 a.m. on the day the project sells. Bidders must comply with the prevailing wage rates on Public Improvements In Summit County and the City of Fairlawn, Ohio as determined by the Ohio Department of Industrial Relations. The right is reserved to reject any or all proposals, to waive technicalities or to advertise for new proposals, if in the judgment of the awarding authority the best Interests of the City will be promoted thereby. 1. Existing System: A. The existing Server Room is currently served by four (4) ductless split systems. Fairlawn GIG would like to expand their server farm into the adjacent Control Room and upgrade the existing Server Room with more robust cooling equipment. B. This phase will upgrade the existing cooling equipment in the existing server room as well as equipment for the new server room expansion. 2. Scope of New Work: A. There is a total of (8) new CRV rack mounted units. The existing ductless split systems will remain as back up. Interior units will be Liebert CRV035 and exterior units will be Liebert MCM040 pad mounted condensers. See cut sheets from Vertiv. B. Relocate the existing split system from the center wall to the south wall. 3. New UPS System: A. (2) new UPS and Battery Systems will be added to the existing storage room. 1. One will power the new data racks in the old lab 2. The other replaces the existing Tripplite UPS for the existing data racks. 3. Both UPS systems are connected together. B, Additional Cooling will be needed to remove the heat from the UPS units. Design Temperature of a maximum of 75 degrees for the room at full load in July. A mini split system is anticipated with the condenser located outside. The project is located at 3487 South Smith Road, Fairlawn, OH 44333. Estimated Value: Police Station $500,000, DataCenter $2,000,000

GC Bidding

Data Centers

$2,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
113
Bidding Soon
1,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

August 18, 2025

Project location map

3487 S Smith Rd, Fairlawn, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.