BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Goldfield, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Est. Value: $ 1,233,879.75 Est. Value Notes: FHWA Emergency Repair Funding Question Deadline 06/08/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Cody Black, PE, Shaw Engineering via email to cody@shawengineering.com. cc: Gina Meyer, Project Coordinator via email to gina@shawengineering.com Est. Completion Date: Oct. 30, 2026 The Project includes the following Work: Furnishing of all materials, labor, equipment, tools, transportation, and services to complete permanent repairs of Silver Peak Road. The Base Bid work of this Contract comprises the rehabilitation of Silver Peak Road in several areas along a 1.8 mile stretch of the road. Rehabilitation methods include grind/pulverization and asphalt paving of multiple sections totaling approximately 51,507 square-feet. The Base Bid work also includes striping repairs (fog lines and centerlines) traffic control, quality control testing and related incidental work. ADD/ALT work includes full slurry seal along 9,400 LF of road with full striping and rumble strip replacement. The Work is located approximately 9 miles east of Silver Peak, Nevada. The Work lies entirely with the 100-foot wide right of way in Esmeralda County. This project is funded in whole or in part by the Federal Highway Administration (FHWA) and administered by the Nevada Department of Transportation (NDOT). Bidders must comply with all applicable federal, state, and local requirements, including bonding, insurance, certification, and Build America, Buy America Act (BABA) provisions. The project is subject to the Davis-Bacon Act and applicable federal labor standards. Nevada State Prevailing Wage Rates shall be those established by the Nevada Labor Commissioner and adopted by the U.S. Department of Labor, including all modifications in effect at the time of bid advertisement.

GC Bidding

Roads / Highways

$1,233,879.00

Public - County

Paving, Site Work

15

27

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
34
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

August 17, 2026

Project location map

Silver Peak Rd, Goldfield, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.