Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Site work for a water / sewer project in Oak Harbor, Washington. Completed plans call for site work for a water / sewer project.
SoW This task order is to Repair and Fully Rebuild 3 Drainage Pumps and Motors in Dry Dock-6, PSNS. Work to include dismantling, transport, overhaul, replacement of parts, reinstallation and commissioning of pumps and electric motors. The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after award. The time stated for completion shall include final cleanup of the premises. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500 for each calendar day of delay until the work is completed or accepted. Statement of Work The contractor shall provide, labor, materials, and equipment, as required, to accomplish the following work in accordance with the basic contract requirements, incorporated clauses, included drawings, enclosures, references and statements herein: This task order is to Repair and Fully Rebuild 3 Drainage Pumps and Motors in Dry Dock-6, PSNS. Work to include dismantling, transport, overhaul, replacement of parts, reinstallation and commissioning of pumps and electric motors. All work must be coordinated with on-going operations in the immediate area, in and around Dry Dock-6. The contractor shall coordinate all laydown areas and access with the government representative. The contractor will contact the government representative within 14 days after award to coordinate submittals and to discuss pre-construction meeting scheduling. All required submittals must be received/accepted by the government prior to the meeting. A pre-construction meeting agenda will be provided by separate correspondence. The Period of Performance shall be 365 days after award.
Post-Bid
Water / Sewer
$2,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
September 5, 2025
To Be Determined, Oak Harbor, WA
Related To This Project
Oak Harbor, WA
Bid Date: Oct 15 2025
Oak Harbor, WA
Bid Date: Nov 18 2025
Oak Harbor, WA
Bid Date: Dec 16 2025
Oak Harbor, WA
Bid Date: Jan 28 2026
Oak Harbor, WA
Bid Date: Feb 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
