BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work for a water / sewer project in Oak Harbor, Washington. Conceptual plans call for site work for a water / sewer project.

A/E DBB Requirement: Phase 2 shall consist of a Design/Build of the entire Main Power Supply Distribution (the building north of 7501A, also referred to as room 401). Replace switchgears components, cabinetry, cabling, cableways, conduit, diesel generator and associated fuel tank, as well as the auto transfer switch. Replace shore power cables from switchgear to Shore Power boom. If the Design/Build does not accommodate new HVAC or building modifications replace the roof and all exhaust fans. Replace Panelboards/Switchboard, circuit breakers, cabling, grounding and conduit for Equipment listed below as necessary in building 7501A. Dispose of all old material. REFERENCES: 1) NAVFAC drawings for Explosive Handling Wharf No 1 2) Strategic Weapon System Electrical and Mechanical (Bangor) Coordination Drawings NOTES: 1) Shore Power boom cables to the submarine are planned for replacement on a separate project. 2) Three panels were replaced in 2015 and do not require replacement (7501-0-104-160A-30-1W, 7501-0-104-160A-32-17 and 7501*0*102*160A*32*05). 3) The Replace Panelboard/Switchboard portion of the project has been divided into two priorities to accommodate for bid overruns. This project ROM was calculated to remove and replace the conduit, should the contractor use existing conduit, the bid should be adjusted. 4) When replacing cables from Main Power Supply to Shore Power booms, the deck material may need to be removed. If deck material needs to be reinstalled it will need to meet strict road level requirements to accommodate ordnance movement. 5) In 2007 and upgrade was installed in the switchgears; however, the units were not changed out. 6) Care must be given to the selection of materials used to ensure longevity of equipment, as they will be potentially exposed to hash enviro ... As of July 15, 2025, this project is included in the City's 2025 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
14
Bidding Soon
2,258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

Project location map

To Be Determined, Oak Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.