Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work for a water / sewer project in Oak Harbor, Washington. Conceptual plans call for site work for a water / sewer project.
A/E DBB Requirement: Phase 2 shall consist of a Design/Build of the entire Main Power Supply Distribution (the building north of 7501A, also referred to as room 401). Replace switchgears components, cabinetry, cabling, cableways, conduit, diesel generator and associated fuel tank, as well as the auto transfer switch. Replace shore power cables from switchgear to Shore Power boom. If the Design/Build does not accommodate new HVAC or building modifications replace the roof and all exhaust fans. Replace Panelboards/Switchboard, circuit breakers, cabling, grounding and conduit for Equipment listed below as necessary in building 7501A. Dispose of all old material. REFERENCES: 1) NAVFAC drawings for Explosive Handling Wharf No 1 2) Strategic Weapon System Electrical and Mechanical (Bangor) Coordination Drawings NOTES: 1) Shore Power boom cables to the submarine are planned for replacement on a separate project. 2) Three panels were replaced in 2015 and do not require replacement (7501-0-104-160A-30-1W, 7501-0-104-160A-32-17 and 7501*0*102*160A*32*05). 3) The Replace Panelboard/Switchboard portion of the project has been divided into two priorities to accommodate for bid overruns. This project ROM was calculated to remove and replace the conduit, should the contractor use existing conduit, the bid should be adjusted. 4) When replacing cables from Main Power Supply to Shore Power booms, the deck material may need to be removed. If deck material needs to be reinstalled it will need to meet strict road level requirements to accommodate ordnance movement. 5) In 2007 and upgrade was installed in the switchgears; however, the units were not changed out. 6) Care must be given to the selection of materials used to ensure longevity of equipment, as they will be potentially exposed to hash enviro ... As of July 15, 2025, this project is included in the City's 2025 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$100,000,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
To Be Determined, Oak Harbor, WA
Related To This Project
Oak Harbor, WA
Bid Date: Aug 13 2025
Oak Harbor, WA
Bid Date: Oct 15 2025
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Jul 31 2019
Oak Harbor, WA
Bid Date: Jun 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
