Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 25, 2025 at 8:00 PM
Updated June 26, 2025
Site work for a bridge / tunnel in Oak Harbor, Washington. Conceptual plans call for site work for a bridge / tunnel.
Project demolishes and replaces deteriorated compressed air system components such as piping, valves and supports located in the Farragut Avenue Utility Tunnel. Project is a design build repair of the Compressed Air piping (CAIR) in the Farragut Utility Tunnel. This portion of the system is serving drydocks, piers and production facilities located in the east and central portions of the Controlled Industrial Area (CIA) of Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS/IMF). Project scope provides for repairs to piping, supports, anchors and incorporates seismic bracing, mechanical repairs by replacement are to carbon steel pipe including associated distribution valves, connectors and manifold devices, site preparation includes implementation of compressed air distribution system access for equipment and personnel, safety features such as traffic control and disposal of debris generated from the removal of the deteriorated piping and associated components, hazardous abatement includes the identification, containment, removal and handling of asbestos containing materials (ACM) and debris along with lead paint,OMSI manuals, and station support for area and utility outages, including relocation of shipyard equipment and materials, lifting and other PSNS/IMF operations requirements. The project is include in the City's 2025 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$2,000,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2026
To Be Determined, Oak Harbor, WA
Related To This Project
Oak Harbor, WA
Bid Date: Jul 31 2019
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Jun 16 2025
Oak Harbor, WA
Bid Date: Jun 16 2025
Oak Harbor, WA
Bid Date: Jun 18 2025
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: May 23 2025
Oak Harbor, WA
Bid Date: Mar 18 2025
Oak Harbor, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
