BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a mixed-use development in Oak Harbor, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of July 17,2025, the project was awarded to C. Johnson Construction, Inc., with an awarded amount of $892,286.08.** Furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the SW LOPEZ DRIVE RECONSTRUCTION PROJECT Proposals are to be submitted only on the forms provided with the Specifications. Contractors are invited to submit bids for the SW LOPEZ DRIVE RECONSTRUCTION PROJ ECT #ENG-24-02 in Oak Harbor, Washington. The project consists of the reconstruction of SW Lopez Drive and SW Kirk Lane, including, but not limited to, replacement of water main, storm drainage facilities, removal of existing asphalt-concrete surfaces, excavation, grading, subgrade preparation, crushed surfacing materials, placing and compacting hot mix asphalt, cement concrete sidewalk replacement, traffic control and other work as identified in the Project drawings, in accordance with the attached Contract Plans, these Contract Provisions, and the 2025 Standard Specifications for Road, Bridge and Municipal Construction The work shall be completed within 45 (forty) working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the request for the Proposal, Plans, Specifications, and (Contract for this project and any addenda issued thereto which are on file at the office of the City Clerk, City Hall, City of Oak Harbor, Washington. The engineer's opinion of probable cost ranges from $1,100,000 to $1,350,000. The City of Oak Harbor reserves the right to reject any or all bids, to waive irregularities or informalities in the bid or in the bidding, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursua nt to the terms of the General Conditions. The City of Oak Harbor intends to award a contract to the lowest responsible and responsive bidder. Each bid must be accompanied by a cashier s check, money order or surety bid bond in the amount of not less than five percent (5%) of the total bid, made payable to the City of Oak Harbor. A Performance Bond as well as a Labor and Material Payment Bond will be required with the Contract. No bidder may withdraw its bid after the hour set for opening thereof or before award of contract, which normally occurs within 45 calendar days after bid opening. The City of Oak Harbor reserves the right to postpone the award for a period of 60 calendar days after bid opening. Bid securities of the three lowest bidders will be held by the City of Oak Harbor until official award of the contract. Inquiries should be directed to The City of Oak Harbor; Alexander K. Warner, P.E., City Engineer, email: AWarner@oakharbor.org, phone: (360) 279 - 4750. The City of Oak Harbor in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$892,286.00

Public - City

Paving, Site Work

16

8

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
166
Bidding Soon
2,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

August 15, 2025

Project location map

SW Lopez Dr, Oak Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.