Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a water / sewer project in Oak Harbor, Washington. Completed plans call for site work for a water / sewer project.

SoW This task order is to Repair and Fully Rebuild 3 Drainage Pumps and Motors in Dry Dock-6, PSNS. Work to include dismantling, transport, overhaul, replacement of parts, reinstallation and commissioning of pumps and electric motors. The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after award. The time stated for completion shall include final cleanup of the premises. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500 for each calendar day of delay until the work is completed or accepted. Statement of Work The contractor shall provide, labor, materials, and equipment, as required, to accomplish the following work in accordance with the basic contract requirements, incorporated clauses, included drawings, enclosures, references and statements herein: This task order is to Repair and Fully Rebuild 3 Drainage Pumps and Motors in Dry Dock-6, PSNS. Work to include dismantling, transport, overhaul, replacement of parts, reinstallation and commissioning of pumps and electric motors. All work must be coordinated with on-going operations in the immediate area, in and around Dry Dock-6. The contractor shall coordinate all laydown areas and access with the government representative. The contractor will contact the government representative within 14 days after award to coordinate submittals and to discuss pre-construction meeting scheduling. All required submittals must be received/accepted by the government prior to the meeting. A pre-construction meeting agenda will be provided by separate correspondence. The Period of Performance shall be 365 days after award.

Post-Bid

Water / Sewer

$2,000,000.00

Public - Federal

Site Work

4

17

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
2
Bidding Soon
1,724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

September 5, 2025

Project location map

To Be Determined, Oak Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.