Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Renovation of a fire / police facility in Belleville, Michigan. Completed plans call for the renovation of a fire / police facility.
Reference Number 0000391194 Sumpter Township is seeking bids for application of protective epoxy floor coating in the Sumpter Township Fire House bays and gear room. Contractor Requirements Contractor shall be responsible for the following: o Prep - grind concrete at breakroom and garage/service area floors to prep surface for coating (16grit MB) o Repair - make minor repairs as needed to create a smooth surface for coatings o Coating - install a 3-layer Polyurea/Polyaspartic floor coating system to approximately 5,775 square ft of bays and gear room.Bays to be completed one at a time to allow for continued operation during the project. System to include o moisture vapor barrier pigmented base coat o full layer of color flakes, color to be determined o Polyaspartic clear top coat o Finishing - elastomeric yellow striping for parking bays o Additionals - Contractor shall be responsible for obtaining waste containers for the removal of all its waste materials, rubbish and packing materials resulting from their operations.If Contractor fails to clean up within five (5) days after completion, the Township may do so, and the cost thereof shall be charged to the Contractor as a deduction in contract price. Contractor shall provide an adequate number of qualified, experienced personnel capable of performing the required work within time frames set forth in township's schedule. All workers and subcontractors performing work shall be skilled in their respective trades. Question Deadline 07/07/2025 at 4:00 PM ET Questions are submitted online No . Requests for clarification and inquiries must be made via email. All requests for clarification must be directed to Eric Luke, Director of Public Safety & Chief of Police at eluke@sumpterpd.org with a subject line "FD Epoxy Floors RFP Clarifications". General Requirements - Contractors License Required - Insurance Required Sumpter Township reserves the right to make awards within sixty (60) days after the date of the bid opening during which period bids may not be withdrawn. The Board of Trustees or its designee reserves the right to reject any or all bids, in part or in total, for any objective or subjective reason whatsoever. Late bids will not be opened. Commencement of Work: August 29, 2025 Returned Proposals: All proposals received after the due date and time will be unopened and made available to the respective contractor for pick-up or return, at its sole cost and expense. Signed Proposals: Each proposal must be an original and hard copy, and signed by an authorized member of the Contractor's firm. This member should be the highest-ranking officer at the local level. NO VERBAL, FAXED, OR EMAILED
Award
Fire / Police
$21,656.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2025
August 29, 2025
20550 Sumpter Rd, Belleville, MI
Related To This Project
Belleville, MI
Bid Date: Jul 24 2025
Belleville, MI
Bid Date: Jul 29 2025
Belleville, MI
Bid Date: Sep 05 2025
Belleville, MI
Bid Date: Oct 23 2025
Belleville, MI
--
Belleville, MI
Bid Date: Nov 10 2025
Belleville, MI
Bid Date: Jul 28 2025
Belleville, MI
Bid Date: Nov 19 2025
Belleville, MI
Bid Date: May 20 2025
Belleville, MI
Bid Date: May 15 2025
Belleville, MI
--
Belleville, MI
Bid Date: May 06 2025
Belleville, MI
Bid Date: May 01 2025
Belleville, MI
Bid Date: Apr 16 2025
Belleville, MI
Bid Date: Apr 24 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
