Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and paving for a mixed-use development in Papillion, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

**As of September 2nd, 2025, the project was awarded to Graham Construction, with an awarded amount of $757,805.10.** The work contemplated in the Proposal consists of removal of the existing gravel surface, vertical profile adjustments, installation of storm sewer pipes and structures, construction of concrete pavement, utility coordination, and temporary traffic control. Sarpy County is Seeking Qualified Contractors to construct road improvements to Cornhusker Road as part of the Northwest Sarpy Road Network, Question Deadline 07/11/2025 at 10:00 AM CT Each electronic bid must include an electronic bid bond in the amount of five percent (5%) of the bid price and must be payable without condition to the Sarpy County Treasurer, to protect Sarpy County against failure to deliver materials as bid. The bid bond must be attached in the attachments tab. The selected Vendor's security will be retained until satisfactory delivery of performance bond and all contract documents are signed and received. All other Vendor's security will be retained for 30 days after bid award. If bid bond as herein set forth is not received with the proposal, the proposal may not be considered. The successful Vendor shall be required to furnish a performance bond and said bond shall be in the amount of 100% of the total amount of the bid, written by a surety licensed to do business in the State of Nebraska. Said performance bond shall be provided to the Sarpy County Clerk within ten (10) days after execution of the contract documents and bid award. Bond may be secured through the Vendor's usual sources. The contract period of performance is seventy (70) Working Days. Therefore, the Contractor shall reimburse the County at the rate of $2,000.00 per day for each additional working day required to complete the work. Milestone Liquidated Damages Milestone 1: $1,500 per day. The successful bidder for the Cornhusker Road project shall commit to achieving substantial completion of Milestone 1 on or before December 31, 2025.

Award

Roads / Highways

$757,805.00

Public - County

Paving, Site Work

56

6

2

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
94
Bidding Soon
956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

September 3, 2025

Project location map

Cornhusker Rd, Papillion, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.