BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and paving for a mixed-use development in Papillion, Nebraska. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIESItemNo.DescriptionQuantityUnit1.CONSTRUCT PCC CURB RAMP (MATCH PAVEMENT THICKNESS)1,769SF2.CONSTRUCT DETECTABLE WARNING PANEL416SF3.CONSTRUCT 5" PCC SIDEWALK14,905SF4.CONSTRUCT 6" PCC MULTI-USE TRAIL4,935SF5.CONSTRUCT IMPRINTED PCC SURFACING(MATCH PAVEMENT THICKNESS)153SF6.INSTALL SEEDING - TYPE A5,400SY7.INSTALL EROSION CONTROL MATTING - S-1505,400SY8.ADJUST UTILITY MANHOLE TO GRADE2EA9.ADJUST UTILITY VALVE TO GRADE17EA10.CONSTRUCT 24" RCP, CLASS III16LF. The work to be performed in this improvement shall consist of the construction of a system of paved public sidewalks and multi-use trails of varying width with Portland Cement Concrete with a varying thickness, together with curb ramps, detectable warning panels, imprinted median surfacing, seeding and matting, and any and all necessary appurtenances and other work that is incidental and necessary for a completed improvement. The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs). The Engineer is the final authority regarding all questions concerning the quality or acceptability of the work. Decisions made by the Engineer are final. The Engineer has executive authority to enforce the Contract. The Engineer reserves the right to suspend all or any part of the work at any time. Sanitary and Improvement District No. 376 of Sarpy County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. The undersigned hereby agrees to commence work within FIVE (5) working days after written Notice to Proceed and further agrees to complete the work to substantial completion within a period of THIRTY-FIVE (35) working days for the entire project after date of said Notice to Proceed, or after the start of construction, whichever occurs first. The undersigned shall forfeit liquidated damages as set forth in the General Provisions in the event of the over-run of time. Liquidated damages will be assessed not as a penalty, but as a predetermined and agreed liquidated damages.

Award

Sidewalks / Parking Lot

$202,181.00

Public - County

Paving, Site Work

15

8

19

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
90
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 11, 2025

Project location map

Multiple Locations, Papillion, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.