Site work for a road / highway in Papillion, Nebraska. Completed plans call for site work for a road / highway.

the furnishing of all labor, tools, materials, equipment, and all else necessary to construct properly all of the improvements within the improvement generally designated STRIPING & SIGNAGE -SECTION 1, Sanitary and Improvement District No. 367 of Sarpy County, Nebraska - GRANITE CREEK WEST. Tabulated, in the presence of all bidders, and consider the bids received for the famishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: STREET NAME SIGN WITH DECORATIVE BRACKET - EXTRUDED ALUMINUM - 58 EA "STOP" SIGN (30") -21 EA "STOP" SIGN (30") WITH ALL WAY PLACARD (24"X12") - 4 EA "SPEED LIMIT" SIGN (18"X24") - 3 EA "NO OUTLET" SIGN (24"X24") - 3 EA PEDESTRIAN CROSSING SIGN (30"X30") WITH "ARROW" PLACARD (24"X12")- 20 EA "YIELD" SIGN (30"X30") -1 EA "KEEP RIGHT" SIGN (24"X30") - 1 EA CITY OF PAPILLION SIGN POLE SYSTEM- 81 EA PERMANENT PAINTED PAVEMENT MARKING - 24" WHITE SOLID - CROSSWALK -360 LF PERMANENT PAINTED PAVEMENT MARKING - 12 " WHITE SOLID - STOP BAR - 300 LF REMOVE TEMPORARY SIGNS - 1 LS CONTINGENCY - 5%. Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $4,550.00 and shall be payable without condition to SANITARY AND IMPROVEMENT DISTRICT NO. 367 OF SARPY COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. No bidder may withdraw his Bid for a period of THIRTY (30) days after the date set for the opening of bids. Doc note: Contractor must give 24-hour notice to Engineer when picking up paper sets. The Owner reserves the right to reject any or all bids and to waive informalities. Question Deadline 10/07/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing

Post-Bid

Roads / Highways

$91,000.00

Public - County

Site Work

10

7

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
1
Bidding Soon
551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 13, 2025

Project location map

Lincoln Rd & Wittmus Dr, Papillion, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.