BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work and paving for a civil project in Federal Way, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Sealed bids are requested for this work. The proposed work consists of (including all other necessary and appurtenant work) the following: removing and disposing of asbestos-cement and ductile iron pipe water mains; installing 4-inch, 6-inch, 8-inch, 10-inch, and 12-inch diameter ductile iron pipe water main; removing valves and installing gate valves; removing and replacing service lines; removing and replacing hydrants; permitting; construction survey and staking; project temporary traffic control; temporary water service and construction sequencing; temporary water pollution and erosion prevention; utility potholing; removing and replacing road pavement; adjustment of utility cover(s); channelization; restoring the site including property restorations; and other related work. The estimated cost range for this project is $3,500,000.00 to $4,400,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Supplement this section with the following: All work shall be physically completed within a total of 120 working days and no later than February 27, 2026, with the exception of Phase 2 water main at/near ADA ramps and signal conduit work at South 320th Street and 8th Avenue South intersection. "Phase 1" and "Phase 2" scope and project limits are defined in the Contract Plans. Complete all work on 21st Avenue SW by no later than December 5, 2025. All water main work along the South 320th Street segment, with the exception of Phase 2 water main at/near ADA ramps and signal conduit work at South 320th Street and 8th Avenue South intersection, shall be completed within forty (40) working days and no later than October 31, 2025. The Phase 2 water main at /near AD ramps and signal conduit work at South 320th Street and 8th Avenue South intersection shall be completed within twelve (12) working days and between March 16th and March 31st, 2026. A maximum total of fifteen (15) nights of work shall be allowed for the South 320th Street segment to limit the night time noise nuisance to the adjacent neighborhood for the entire project. The number of allowed working days includes time to accomplish force account work in the bid schedule.

Post-Bid

Water / Sewer

$4,400,000.00

Public - State/Provincial

Paving, Site Work

88

13

10

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.