BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

This is a service / maintenance or supply contract in Montreal, Quebec. Contact the soliciting agency for additional information.

Reference Number 0000296615 Question Acceptance Deadline Jul 16, 2025 02:00 PM EDT Scope of Work Overview: GOC3534214- HVAC Standard Operating Procedure Objectives: Establish written instructions for the operation; maintenance and testing/verification of HVAC systems and the calibration of all sensors; probes and gauges on which the systems depend for efficient operation. The regulations require site-specific standard operating procedures that are intended to prevent inadvertent releases and to instruct on-site and maintenance personnel on how to maintain ongoing compliance with applicable regulations. Standard operating procedures must be created for sites where halocarbon-containing equipment with a nominal cooling capacity of more than 10KG of halocarbon is located. The consultant will have to follow the detailed document of the scope of work (M5FR - Standard Operating Procedures _CT (see annex D7) to create the SOP attached to this document. 1- Provide a brief clarification on the systems (tons) and equipment installed (DX; Roof Top; coolers; pumps; cooling towers; boilers; primary loop; secondary; etc.). GOC3534221- Standard Operating Procedure on the operation of boilers-pressure vessels Objectives: The document defines the SOP (Standard Operating Procedure) to follow the new regulation on equipment called boiler and pressure vessels. The purpose of this project is therefore the development of SOPs according to section 7.4. Part B to article 7.4.2 of the PSPC Directive on the operation of boilers and pressure vessels updated on 2019-04-01. The objectives of the Standard Operating Procedures (SOP) manual are intended to serve as a guide for operators and to the building systems technicians and their supervisors in carrying out the various tasks required in order to optimize the effectiveness of the interventions; optimize the total maintenance schedule; minimize equipment downtime and of course minimize any risk of serious injuries that could occur to operators and fixed machinery mechanics. The consultant will have to follow the detailed document of the scope of work (M07FR - standard operating procedures _CT (see appendix D7.1) to create the SOP. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Municipal

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
132
Bidding Soon
2,723
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

Project location map

Multiple Locations, Montreal, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.