BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work and paving for a mixed-use development in San Antonio, Florida. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City, at its sole discretion, reserves the right to waive technicalities or irregularities, to reject any or all bids, and/or to accept that bid which is in the best interest of the City. An original and two (2) copies (collated in sets) and one (1) USB drive or optical disc containing the proposal in PDF/A format of the bid form and all required bid submittal data including any bidder generated specifications, drawings, etc., shall be enclosed within a sealed envelope with the words, SEALED BID NO. 1-2025; Lot & Right-of-Way Drainage Improvement Contract and the Bidders name and address clearly shown on the outside thereof. Mailed bids must be received in the office of the Clerk not later than the time set forth for bid opening. The City will not be responsible for any lost or late arriving bids sent via U.S. Postal Service or any other delivery service. The City of San Antonio is accepting proposals from qualified contractors to award a paving construction and maintenance contract for Palm Ridge Drive, including curb and gutter, roadside underdrain systems, driveway construction, and other necessary work as detailed in the Engineer Specifications. 1. Description of bid services: The Municipality is seeking to award a construction and maintenance contract for Palm Ridge Drive. The scope of services will include underdrain installation/construction as detailed in the Engineer's Specifications attached hereto as Exhibit "H". A single construction phase is required. 2. There shall be a set price for all construction activities. 3. All materials to be used shall meet the specified ASTM, AWWA, FAC and Florida Building code established standards and requirements, or other standards provided in the Engineer's Specifications. 4. All construction shall conform to the City's/Engineer's Specifications. 5. Contractor shall be responsible for any required OSHA requirements. 6. The contractor agrees that a work day shall consist of the 8AM to 5PM time frame on the Official Bid form. 7. Contractor shall be licensed in the State of Florida. 8. Contractor must attend the pre-construction meeting set up by the City, and shall be reasonably available for any other construction meetings the City's Engineering consultant deems prudent

Award

Water / Sewer

$211,452.00

Public - City

Paving, Site Work

5

3

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 1, 2025

Project location map

Palm Ridge Dr, San Antonio, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.