BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work and paving for a mixed-use development in Omaha, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

At such hour, or as soon as practicable thereafter, the Board of Trustees of the District wiil proceed to open in the presence of all bidders and consider the bids received for the furnishing of such labor, materials, and equipment necessary' for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed beiow and other related preparatory and subsidiary work from issuance of the Notice to Proceed The Engineer's estimate of the construction or other effectuation of ail of such improvements and work is $138,865.00. Each bid must be accompanied in a SEPARATE SEALED ENVELOPE by a certified check drawn on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in the amount of $6,945.00, payable without condition to the Treasurer, Sanitary and Improvement District No. 427 of Douglas County, Nebraska, or a bid bond for a like amount as evidence of good faith of the bidder and as agreed upon liquidated damages to the District in the event the bidder whose proposal is accepted by the Board of Trustees of the District fails to enter into contract within ten (10) days after Notice of . Award and furnish acceptable bond to complete the work and pay for ail labor done and materials used, such bond to be in the amount of 100% of the total bid price. No bidder may withdraw his proposal for a period of thirty (30) days after the date set for the opening of bids. Sanitary and Improvement District No. 427 of Douglas County, Nebraska, reserves the right to waive informalities and to reject all or any bids Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: REPAIR PAVING IN STREETS WITHIN THE BOUNDARIES OF THE DISTRICT, INCLUDING SAW-CUTTING, REMOVAL OF EXISTING PAVING, REPAIR AND PREPARATION OF SUBGRADE, REPLACEMENT OF PAVING WITH PORTLAND CEMENT CONCRETE PAVING, SODDING DISTURBED AREA AND ALL WORK THAT MAY BE CONSIDERED INCIDENTAL THERETO IN VARIOUS LOCATIONS IN THE STREETS The Project includes the following Work: ITEM NO. BID ITEM DESCRIPTION APPROXIMATE QUANTITY 1 CRACK OR JOINT REPAIR - TYPE A 205 LF 2 CONCRETE PAVEMENT REPAIR - LARGE AREA (TYPE OPW 4000) 245 SY 3 CONCRETE PAVEMENT REPAIR - SMALL AREA (TYPE OPW 4000) 1,065 SY 4 REPAIR CURB AND GUTTER 15 LF 5 CONSTRUCT TRAFFIC CALMING DEVICE - SPEED HUMP 1 LS 6 PERMANENT PREFORMED TAPE SYMBOL - "BUMP" 2 EA 7 PERMANENT PREFORMED TAPE SYMBOL - SPEED HUMP SYMBOL 2 EA 8 "SPEED BUMP" (30"X30") SIGN W/ "15 M.P.H." (18"X18") PLACARD 2 EA 9 UNSUITABLE SUBGRADE MATERIAL 30 CY 10 SODDING 110 SY 11 JET EXISTING SANITARY SEWER 565 LF

Bid Results

Sidewalks / Parking Lot

$125,970.00

Public - County

Paving, Site Work

5

7

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
1
Bidding Soon
519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 15, 2025

Project location map

Multiple Locations, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.